My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-14_REVISION - C1981018 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2015-10-14_REVISION - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:41 PM
Creation date
10/16/2015 7:58:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/14/2015
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR167
Email Name
JRS
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # MR167A02 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Backfill and Regrade Drill Pads for 7 Exploration Holes <br />Site: Deserado Mine Permit Action: Minor Revision 167 Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: MR167A02 State: <br />Date: 10/14/2015 County: <br />User: JRS <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C018-MR167A02 <br />Total unit Cost/Hour: $272.98 <br />Total Fleet Cost/Hour: $272.98 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,300 <br />Swell factor: 1.125 <br />Loose volume: 2,588 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />5,600 feet <br />2,650 lbs/LCY <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />rock - 25% Rock, 75% Earth <br />Source <br />0.900 <br />(AB -AVG.) <br />Utilization % <br />Ownership Cost/Hour: <br />$81.29 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$10.52 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $272.98 <br />Total Fleet Cost/Hour: $272.98 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,300 <br />Swell factor: 1.125 <br />Loose volume: 2,588 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />5,600 feet <br />2,650 lbs/LCY <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />rock - 25% Rock, 75% Earth <br />Source <br />0.900 <br />(AB -AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.