My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-14_REVISION - C1981018 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2015-10-14_REVISION - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:41 PM
Creation date
10/16/2015 7:58:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
10/14/2015
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR167
Email Name
JRS
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Minor Revision 167 Cost Summary <br />Site: Deserado Mine Permit Action: Minor Revision 167 Permit/Job#: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: MR167A00 State: Colorado <br />Date: 10/14/2015 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C018-MR167A00 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />MR16 <br />Plug and Seal 9 Exploration Holes <br />BOREHOLE <br />1 <br />8.00 <br />$2,007.45 <br />7A01 <br />10.00 <br />Total = <br />$751.40 <br />Total = <br />$0.00 <br />MR16 <br />1 <br />$974.00 <br />Backfill and Regrade Drill Pads for 7 Exploration <br />DOZER <br />3.57 <br />7A02 <br />Holes <br />MR16 <br />1 <br />$508.00 <br />Replace Topsoil from Stockpile to 7 Drill Pads <br />DOZER <br />1.86 <br />7A03 <br />MR16 <br />1 <br />$1,143.00 <br />Regrade Light -Use Roads <br />DOZER <br />4.19 <br />7A04 <br />MR16 <br />1 <br />$550.00 <br />Replace Topsoil from Stockpile to Light -Use <br />DOZER <br />2.02 <br />7A05 <br />Roads <br />MR16 <br />1 <br />$2,332.00 <br />Reseed 7 Drill Pads and Associated Light -Use <br />REVEGE <br />0.50 <br />7A06 <br />Roads <br />SUBTOTALS: <br />20.14 <br />$7,514 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$151.78 <br />Performance bond: <br />1.05 <br />Total = <br />$78.90 <br />Job superintendent: <br />10.07 <br />Total = <br />$756.86 <br />Profit: <br />10.00 <br />Total = <br />$751.40 <br />Total = <br />$0.00 <br />TOTAL O & P = <br />$1,738.94 <br />TOTAL INDIRECT COST = <br />CONTRACT AMOUNT (direct + O & P) = <br />$9,252.94 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />4.61 <br />Total = <br />$426.56 <br />Reclamation management and/or administration: <br />3.58 <br />$331.26 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$2.496.76 <br />TOTAL BOND AMOUNT (direct + indirect) = $10,010.76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.