Laserfiche WebLink
Total Seed Application Cost/Acre <br />MULCHING and MISCELLANEOUS <br />Materials <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />$0.00 <br />Juniper, One -seed <br />3 <br />Tubling, 10 cu. in. container <br />$1.77 <br />Total Mulch Materials Cost/Acre <br />$5.31 <br />$0.00 <br />ADDlication <br />Description <br />Cost /Acre <br />Type and Size <br />Planting <br />Cost <br />Total Mulch Application Cost/Acre <br />$0.00 <br />NURSERY STOCK PLANTING <br />Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />Juniper, One -seed <br />3 <br />Tubling, 10 cu. in. container <br />$1.77 <br />$2.40 <br />$5.31 <br />{(MEANS) <br />Pine, Ponderosa <br />1 <br />Tubling, 10 cu. in. container <br />$1.45 <br />$2.40 <br />$1.45 <br />{(MEANS) <br />Sumac, Skunkbrush <br />12 <br />Tubling, 10 cu. in. container <br />$3.86 <br />$2.40 <br />$46.32 <br />{(MEANS) <br />Totals Nursery Stock Cost / Acre <br />1 $53.08 <br />JOB TIME AND COST <br />No. of Acres: 36 Cost /Acre: $53.08 <br />Estimated Failure Rate: 50% Cost /Acre*: $53.08 <br />*Selected Replanting Work Items: I NURSERY <br />Initial Job Cost: <br />$1,910.88 <br />Reseeding Job Cost: <br />$955.44 <br />Total Job Cost: <br />$2,866 <br />Job Hours: <br />72.00 <br />CIRCES Cost Estimating Software <br />