My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-13_REVISION - C1981014 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2015-10-13_REVISION - C1981014 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:31 PM
Creation date
10/15/2015 7:41:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
10/13/2015
Doc Name
Appendix F Reclamation Cost Estimate (RN06)
From
Energy Fuels Coal, Inc
To
DRMS
Type & Sequence
SL3
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile to Refuse Pile <br />Site: Southfield Mine Permit Action: RN6 Permit/Job#: C1981014 <br />PROJECT IDENTIFICATION <br />Task #: 011 State: Colorado <br />Date: 8/1/2014 County: Fremont <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />>craper: Cat 62 <br />-Dozer: NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />ad Maintenance —Motor Grader: <br />-Water Truck: <br />Cant RrPakdnwn! Srraner Work Team <br />Abbreviation: None <br />Filename: C014-011 <br />COSTShift basis: 1 per day <br />NA <br />NA <br />CAT 14M <br />Water Tanker, 2,500 Gal. <br />Sunnort Enninment <br />Maintenance Eauinment <br />Total work team cost/hour: $707.46 <br />MATERIAL OUANTITIES <br />Initial volume: 17,100 CCY Swell factor: 1.125 <br />Loose volume: 19,238 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$72.62 <br />NA <br />NA <br />NA <br />$42.03 <br />$7.43 <br />Operating cost/hour: <br />$187.56 <br />NA <br />NA <br />NA <br />$34.94 <br />$11.12 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$293.74 <br />NA <br />NA <br />NA <br />$101.43 <br />$18.55 <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$587.48 <br />Support: <br />$0.00 <br />Maint: <br />$119.98 <br />Total work team cost/hour: $707.46 <br />MATERIAL OUANTITIES <br />Initial volume: 17,100 CCY Swell factor: 1.125 <br />Loose volume: 19,238 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,550 lbs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />52,800 pounds <br />Payload Capacity: <br />20.71 LCY <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />0.90 Minutes <br />0.60 Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.