Laserfiche WebLink
casing <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Zenith #2 <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />marker <br />location/identification <br />marker (EA, material <br />cost only) <br />SR -46 marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />location/identification <br />marker (EA, material <br />cost only) <br />SR -46 cut <br />Exposed casing <br />6 <br />1.5 <br />1.00 <br />LF <br />$6.04 <br />$6.04 <br />casing <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />SR -46 Drill rig <br />SCHRAMM <br />NA <br />NA <br />4.50 <br />EA <br />$251.66 <br />$1,132.47 <br />& labor <br />T450BH <br />SR -46 water <br />Water Tanker, 2,500 <br />NA <br />NA <br />4.50 <br />EA <br />$29.67 <br />$133.52 <br />truck <br />Gal. <br />SR -46 Bottom <br />PVC plug - 6 in. <br />6 <br />NA <br />1.00 <br />EA <br />$52.93 <br />$52.93 <br />Plug <br />diameter borehole <br />SR -46 Seal <br />Portland cement <br />6 <br />479 <br />47.00 <br />bag <br />$11.83 <br />$556.01 <br />Hole <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />SF -87-06 Seal <br />Portland cement <br />6 <br />439 <br />43.00 <br />bag <br />$11.83 <br />$508.69 <br />Hole <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />SF -87-06 cut <br />Exposed casing <br />6 <br />1.5 <br />1.00 <br />LF <br />$6.04 <br />$6.04 <br />casing <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />SF -87-06 <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />marker <br />location/identification <br />marker (EA, material <br />cost onl ) <br />SF -87-06 <br />PVC plug - 6 in. <br />6 <br />NA <br />1.00 <br />EA <br />$52.93 <br />$52.93 <br />bottom plug <br />diameter borehole <br />SF -87-06 drill <br />SCHRAMM <br />NA <br />NA <br />4.00 <br />EA <br />$251.66 <br />$1,006.64 <br />rig & Labor <br />T450BH <br />SF -87-06 <br />Water Tanker, 2,500 <br />NA <br />NA <br />4.00 <br />EA <br />$29.67 <br />$118.68 <br />Gal. <br />SR -7 Seal <br />Portland cement <br />4 <br />637 <br />28.00 <br />bag <br />$11.83 <br />$331.24 <br />Hole <br />grout ( Bag, material <br />cost only ...94 lb. bag) <br />SR -7 Bottom <br />PVC plug - 4 in. <br />4 <br />NA <br />1.00 <br />EA <br />$29.28 <br />$29.28 <br />Plug <br />diameter borehole <br />SR -7 Cut <br />Exposed casing <br />4 <br />1.5 <br />1.00 <br />LF <br />$6.04 <br />$6.04 <br />casing <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />SR -7 Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />location/identification <br />marker (EA, material <br />cost onl ) <br />SR -7 Drill rig <br />SCHRAMM <br />NA <br />NA <br />6.00 <br />EA <br />$251.66 <br />$1,509.96 <br />& labor <br />T450BH <br />SR -7 water <br />Water Tanker, 2,500 <br />NA <br />NA <br />6.00 <br />EA <br />$29.67 <br />$178.02 <br />truck <br />Gal. <br />SR -22A Seal <br />Portland cement <br />4 <br />372 <br />16.00 <br />ba <br />$11.83 <br />$189.28 <br />CIRCES Cost Estimating Software <br />