Laserfiche WebLink
Task description: <br />Site: Southfield Mine <br />BOREHOLE SEALING WORK <br />Seal Boreholes <br />Permit Action: RN6 <br />PROJECT IDENTIFICATION <br />Task #: 053A State: Colorado <br />Date: 1/14/2015 County: Fremont <br />12:24:40 PM <br />User: JHB <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Permit/Job#: C1981014 <br />Abbreviation: None <br />Filename: C014 -53A <br />Borehole <br />Sealing/Item <br />Description <br />Method <br />Diameter <br />Length <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />SF87-07 Seal <br />Portland cement <br />4 <br />520 <br />23.00 <br />bag <br />$11.83 <br />$272.09 <br />hole <br />grout ( Bag, material <br />cost only ... 94 lb. bag) <br />SF87-07 plug <br />PVC plug - 4 in. <br />4 <br />NA <br />1.00 <br />EA <br />$29.28 <br />$29.28 <br />diameter borehole <br />SF87-07 <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />marker <br />location/identification <br />marker (EA, material <br />cost only) <br />SF87-07 cut <br />Exposed casing <br />4 <br />1.5 <br />1.00 <br />LF <br />$6.04 <br />$6.04 <br />casing <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />SF87-07 Drill <br />SCHRAMM <br />NA <br />NA <br />5.00 <br />EA <br />$251.66 <br />$1,258.30 <br />rig & labor <br />T450BH <br />SF87-07 water <br />Water Tanker, 2,500 <br />NA <br />NA <br />5.00 <br />EA <br />$29.67 <br />$148.35 <br />truck <br />Gal. <br />SF87-09 Seal <br />Portland cement <br />4 <br />330 <br />14.00 <br />bag <br />$11.83 <br />$165.62 <br />Hole <br />grout ( Bag, material <br />cost only ...94 lb. bag) <br />SF87-09 <br />PVC plug - 4 in. <br />4 <br />NA <br />1.00 <br />EA <br />$29.28 <br />$29.28 <br />bottom plug <br />diameter borehole <br />SF87-09 water <br />Water Tanker, 2,500 <br />NA <br />NA <br />3.00 <br />EA <br />$29.67 <br />$89.01 <br />truck <br />Gal. <br />SF87-09 Drill <br />SCHRAMM <br />NA <br />NA <br />3.00 <br />EA <br />$251.66 <br />$754.98 <br />rig & labor <br />T450BH <br />SF87-09 cut <br />Exposed casing <br />4 <br />1.5 <br />1.00 <br />LF <br />$6.04 <br />$6.04 <br />casing <br />removal - 4 to 10 in. <br />diameter steel pipe <br />LF <br />SF87-09 <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 <br />$2.89 <br />marker <br />location/identification <br />marker (EA, material <br />cost only) <br />Liberty #2 <br />Portland cement <br />6 <br />360 <br />35.00 <br />bag <br />$11.83 <br />$414.05 <br />Seal hole <br />grout ( Bag, material <br />C ost onl ...94 lb. bag) <br />Liberty #2 <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.89 1 <br />$2.89 <br />CIRCES Cost Estimating Software <br />