My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-13_REVISION - C1981014 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2015-10-13_REVISION - C1981014 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:31 PM
Creation date
10/15/2015 7:41:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
10/13/2015
Doc Name
Appendix F Reclamation Cost Estimate (RN06)
From
Energy Fuels Coal, Inc
To
DRMS
Type & Sequence
SL3
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.60 Minutes <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: 1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: 0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 6100 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Nan] Rnnte- <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res Total Res <br />(%) (%) <br />Velocity (fpm) Travel Time <br />(min) <br />1 2500.00 -4.00 <br />3.00 -1.00 <br />2938 0.90 <br />2 2000.00 8.00 <br />3.00 11.00 <br />1018 1.66 <br />Haul Time: 2.56 minutes <br />Retnrn Route - <br />Seg # <br />Haul Distance (Ft) Grade Roll. Res <br />(%) (%) <br />Total Res Velocity (fpm) Travel Time <br />(%) (min) <br />1 <br />2000.00 -8.00 3.00 <br />-5.00 2938 0.73 <br />2 <br />2500.00 4.00 3.00 <br />7.00 2555 0.91 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 396.84 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.148 /LCY <br />1.64 <br />minutes <br />5.70 <br />minutes <br />329.38 <br />LCY/Hour <br />2 <br />Scraper(s) <br />329.38 <br />LCY/Hour <br />329.38 <br />LCY/Hour <br />Total job time: 4.10 Hours <br />Total job cost: $2,900 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.