Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile M-3 to Ponds 3 and 4 <br />Site: Southfield Mine Permit Action: RN6 Permit/Job#: C1981014 <br />PROJECT IDENTIFICATION <br />Task #: 045 State: Colorado <br />Date: 8/1/2014 County: Fremont <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: I Cat <br />-Dozer: NA <br />Abbreviation: None <br />Filename: C014-045 <br />COSTShift basis: 1 ver day <br />.ption <br />Support Equipment -Load Area: NA <br />-Dura Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 2,500 Gal. <br />Cart Rreakdnwn_ Sernner Work Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $707.46 <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$72.62 <br />NA <br />NA <br />NA <br />$42.03 <br />$7.43 <br />Operating cost/hour: <br />$187.56 <br />NA <br />NA <br />NA <br />$34.94 <br />$11.12 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$293.74 <br />NA <br />NA <br />NA <br />$101.43 <br />$18.55 <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$587.48 <br />Support: <br />$0.00 <br />Maint: <br />$119.98 <br />Total work team cost/hour: $707.46 <br />MATERIAL QUANTITIES <br />Initial volume: 4,500 <br />CCY <br />Swell factor: 1.125 <br />Loose volume: 5,063 <br />LCY <br />Source of estimated volume: <br />Page 2.05.3-60 <br />Source of estimated swell factor: <br />Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,550 lbs/LCY <br />Struck Volume: 15.70 <br />LCY <br />Material description: Earth - Dry packed <br />Heaped Volume: 22.00 <br />LCY <br />Rated Payload: 52,800 pounds <br />Average Volume: 18.85 <br />LCY <br />Payload Capacity: 20.71 LCY <br />Adjusted Capacity: 18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />