Laserfiche WebLink
Page 2 <br />The Following Enclosed Permit Maps are Modified and or New. <br />M-3 (3 sheets), M -4A, M-lOB (sheet 3), M-16, M-28, M-51 (sheet 3), M -54D, E, F G, H (new <br />maps) <br />Enclosed Appendix A materials; Table A-1.1, A-3.1, A-5.1, A-7.1 and A-7.2 should <br />replace previously submitted tables by the same name. Two TALPAC Scraper cost runs <br />are also included, they may be needed to replace sheets identified by Haul Cycle: [PRJ] <br />A96 -IA (2 sheets) as needed. <br />Enclosed Appendix Q materials as mentioned above; Section XXXVII; Reconstructed <br />Drainage Channel Design Model, (text, hydrologic modeling) will be placed in the newly <br />activated section of Appendix Q. A new table of contents for App. Q has been included <br />also. <br />Please contact me if you should have any questions. <br />Sincerely, <br />Graham Roberts <br />Environmental Engineer <br />GCR <br />End <br />c File 109.2.3.4 (w/o encl) <br />Revisions notebook (w/o encl) <br />T. Lynch, CDRMS (w/o encl) <br />