Laserfiche WebLink
If <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec Wkv <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />w�eeter <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: Placement and compaction of the Phase 1 Structural Fill <br />materials; subgrade acceptance; placement, compaction, density testing, depth verification and <br />acceptance of Soil Liner Fill materials; geomembrane installation and acceptance; Drain Cover Fill <br />placement; and pump monitoring at the LVSCS riser pipes. <br />II) Laboratory Activities: <br />Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected <br />General Prosect Items <br />Meetings and Discussions: <br />Phase 1 — Soil Liner Fill; 1-SLF-44-R <br />Cameron — Soil Liner Fill; SLF-196-C <br />The Weekly Contractor Meeting was held September 24, 2015 (Amec Foster Wheeler, CC&V, Ames). <br />Amec Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: Ames safety stand down. 9/21/15, 12pm — 9/23/15, 8am. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: ECA received 48 rolls of 80 -mil LLDPE textured geomembrane. <br />CQA Monitor 1/4 <br />Submitted by: / <br />Bobby Redd, EI <br />Project Resident <br />Reviewed by: <br />CC&V Projects f <br />Reviewed By: <br />Date: October 2, 2015 <br />Date: <br />Date: /d A, �/ S <br />Reviewed By: Date: <br />