My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-08_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-10-08_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:25 PM
Creation date
10/13/2015 5:07:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/8/2015
Doc Name
Weekly QA Report
From
Newmont
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. ATa <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: September 19, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 9.13.2015 through 9.19.2015 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 58°F to 70°F Cloud Cover: Partly Cloudy to Mostly Cloudy <br />Lows: 33°F to 47°F Precipitation: None <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />I) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A Cat excavator loaded John Deere 740 haul trucks with Structural Fill from below station <br />FM7+00. The material was transported to station F26+00 where a Cat dozer placed the <br />Structural Fill. A Cat smooth drum roller compacted the fill area. <br />Cat 740 haul trucks delivered Structural Fill to station J6+00. Cat dozers placed Structural Fill <br />between stations J0+00 to J6+00 and graded the slope below stations JMO+00 to J14+00 and <br />H28+00 to H30+00. A Cat dozer graded the slope below station H0+00 to H4+00. A Cat smooth <br />drum roller compacted the fill area. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br />placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />Days <br />S <br />M <br />I T <br />I W <br />I T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />D=Day Shift N=Night Shift W= Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 58°F to 70°F Cloud Cover: Partly Cloudy to Mostly Cloudy <br />Lows: 33°F to 47°F Precipitation: None <br />Wind: Calm to moderate <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />I) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />A Cat excavator loaded John Deere 740 haul trucks with Structural Fill from below station <br />FM7+00. The material was transported to station F26+00 where a Cat dozer placed the <br />Structural Fill. A Cat smooth drum roller compacted the fill area. <br />Cat 740 haul trucks delivered Structural Fill to station J6+00. Cat dozers placed Structural Fill <br />between stations J0+00 to J6+00 and graded the slope below stations JMO+00 to J14+00 and <br />H28+00 to H30+00. A Cat dozer graded the slope below station H0+00 to H4+00. A Cat smooth <br />drum roller compacted the fill area. <br />CC&V hauled material to the Dump 4 surge in Phase 2 using Cat 793 haul trucks. A Cat dozer <br />placed the Structural Fill between stations N20+00 and N22+00. A Cat smooth drum roller <br />compacted the fill area. <br />All of the above Structural Fill material was placed, compacted, and graded per the project plans <br />and specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.