My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-13_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2015-10-13_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:30 PM
Creation date
10/13/2015 5:04:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
10/13/2015
Doc Name
Monitoring and Activities Summary
From
Battle Mountain Resources
To
DRMS
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />October 07, 2015 <br />Mr. Wally Erickson <br />State of Colorado <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No,M-88-112 <br />September 2015 MoRTh'IyReport <br />Dear Mr. Erickson: <br />RECEIVED <br />OCT 13 2015 <br />OMSM OF RECLAMATION <br />WAND SAFETY <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br />San Luis Project for the month of September, 2015. <br />Surface and ground water monitoring and analysis were completed for all required sites during the month <br />per the terms and conditions of the TR -32 Quality Assurance and Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on September 30'', no water was present for sampling and <br />subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br />Pit monitoring wells on September 30d. September tailing impoundment piezometer measurements <br />identified these installations were either dry or contained less than 12 inches of water as illustrated in <br />Table 2. Tables 1 and 2 below identify the depth to water measurements collected for each of the site <br />monitoring wells, piezometers and lysimeters as required by the terms and conditions of the TR -32 <br />QA/QC plan. <br />The leak detection system was measured on September 30`h. A total of 870 gallons of water was <br />excavated from the leak detection system yielding a monthly average of 29 gpad. The tailings pond <br />under -drain measured 42gpm. <br />During the month of September, the West Pit water treatment plant operated efficiently discharging a total <br />of 7,474,500 gallons (22.94 acre-feet) of water to Rito Seco Creek and a total of 1,401,900 gallons (4.30 <br />acre-feet) of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito <br />Seco Creek remained dry during the month. <br />P.O. Box 310 • San Luis, Colorado 81152-0310 • (719) 379-0798 • Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.