My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-13_REPORT - P2009025
DRMS
>
Day Forward
>
Report
>
Prospect
>
P2009025
>
2015-10-13_REPORT - P2009025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 9:51:45 AM
Creation date
10/13/2015 5:04:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009025
IBM Index Class Name
REPORT
Doc Date
10/13/2015
From
Black Range Minerals
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Fee/Report
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 6 <br />8. Estimated new acreage to be affected in the next report year: <br />9. Estimated acres to be reclaimed in the next report year: <br />10. Total acres in various stages of reclamation, since permitted exploration activities began: <br />Total <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />,i) L <br />seeded w/ <br />(, <br />w/topsoil <br />` <br />mulched w/� <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />I <br />fertilized w/ <br />/�l <br />/yt <br />replacement <br />n, Ll`' <br />rate (tons/ac): <br />Iri <br />aped fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application, <br />C d v1 !% <br />application <br />�L. , <br />application�1 <br />method: <br />method: <br />method: <br />11. Is weed control being conducted in accordance with an approved Weed Control Plan? NO N/A <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOI? <br />If "NO", please explain: <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />OE NO N/A <br />ES NO N/A <br />14. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO1� <br />15. Are all hazardous materials stored within approved spill containment structures? ES NO N/A <br />16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring m1fipwiation <br />annually? YES N/A <br />If "Yes", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in place <br />and is adequate to fully reclaim the approved prospecting site disturbance(s). <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: �ee `�e�" �t <br />18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />
The URL can be used to link to this page
Your browser does not support the video tag.