Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiency: 0.830 NA (CAT HB) <br />Site Altitude: 6100 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route - <br />Seg # <br />Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />3960.00 -4.00 <br />3.00 <br />-1.00 <br />2938 <br />1.39 <br />Haul Time: 1.39 minutes <br />Return Route - <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />3960.00 <br />4.00 <br />3.00 <br />7.00 <br />2555 <br />1.70 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 492.81 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.023 /LCY <br />1.70 <br />minutes <br />4,59 <br />minutes <br />409.03 <br />LCY/Hour <br />2 <br />Scraper(s) <br />409.03 <br />LCY/Hour <br />409.03 <br />LCY/Hour <br />Total job time: 16.50 Hours <br />Total job cost: $13,655 <br />CIRCES Cost Estimating Software <br />