Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 080 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade Borrow Area <br />Site: Southfield Mine Permit Action: RN6 Permit/Job#: C1981014 <br />PROJECT IDENTIFICATION <br />Task #: 080 <br />Date: 3/12/2015 <br />User: JRS <br />State: <br />County: <br />Colorado <br />Fremont <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Abbreviation: None <br />Filename: C014-080 <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$253.73 <br />$253.73 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />400 <br />1.000 <br />400 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient <br />Average site altitude.- <br />Material <br />ltitude: <br />Material weight: <br />Weight description: <br />0% <br />6,100 feet <br />2,650 lbs/LCY <br />sed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Utilization % <br />Ownership Cost/Hour: <br />$72.57 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$3&01 <br />NA <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$253.73 <br />$253.73 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />400 <br />1.000 <br />400 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient <br />Average site altitude.- <br />Material <br />ltitude: <br />Material weight: <br />Weight description: <br />0% <br />6,100 feet <br />2,650 lbs/LCY <br />sed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG.) <br />Material consistency: <br />1.000 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />