Laserfiche WebLink
Midterm Review <br />Bowie No. 1 Mine <br />C-1981-038 <br />This document presents the results of the Midterm Permit Review of the Bowie Resources, <br />LLC.'s (BRL) Bowie No. 1 Mine. The Colorado Division of Reclamation, Mining and Safety <br />(Division) conducted this review for the purpose of fulfilling the requirements of the Colorado <br />Surface Coal Mining Reclamation Act and the Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining. <br />This Midterm Review was conducted to fulfill the requirements of Sections 2.08.3, 2.06.2(10), <br />2.06.3(4)(a), 2.06.5(3), 2.06.7(5) and 3.02.2(4). <br />Section 2.08.3 of the Regulations requires that the Division conduct a review of each permit <br />issued, prior to its midterm. Based on this review, for good cause shown, the Division may <br />require reasonable revisions or modifications of the permit provisions to ensure compliance with <br />the Act and Regulation. <br />Section 3.02.2(4) requires that the Division review the amount of the bond and the terms of <br />acceptance of the bond every 2 1/2 years. <br />Sections 2.06.2(10), 2.06.3(4)(a), 2.06.5(3) and 2.06.7(5) require that experimental practices, <br />mountaintop removal variances, variances from approximate original contour (AOC) for steep <br />slope mining and variances from contemporaneous reclamation for combined surface and <br />underground mining, respectively, be reviewed by the Division where applicable during the <br />Midterm Review. Of these, the Bowie No. 1 Mine permit includes variances for restoration of <br />affected lands to their approximate original contour in accordance with Rules 2.06.5 and 4.27. <br />The variance was granted under the 1981 permit and was reaffirmed under Permit Renewal No. 6 <br />(RN -6). The variance applies to the mine benches only and was granted due to the fact that <br />backfilling the benches to approximate original contour on the steep slopes would not achieve <br />the required slope stability safety factor of 1.3. <br />This Midterm Review consisted of a detailed review of the following document: <br />• The Bowie No. 1 Mine permit application, including stipulations and responses <br />• All revisions made to the permit since the issuance of the permit <br />• The Bowie No. 1 Mine annual reclamation and hydrology reports <br />• Bond surety and reclamation cost estimate <br />• The Division findings document <br />• The Division's inspection reports <br />• Any notices of violations since the issuance of the permit <br />Bowie No. 1 Mine -2- 10/13/2015 <br />