Table A-12.1 (Cont.) Demolition - Structures Page No. 35
<br />Struckture or Item Description
<br />Dimensions
<br />Demoliton Menu Selection
<br />uanti
<br />Unit
<br />'Unit Cost
<br />To al ost
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />New 2007 Emulsion tank
<br />15,000 gal.
<br />Max. 10,000 ft. haul
<br />1,600
<br />CF
<br />$ 0.17
<br />$ 268.80
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Concrete Pad
<br />1,642
<br />Max. 10,000 ft. haul
<br />1,642
<br />SF
<br />$ 1.55
<br />$ 2,545.10
<br />Demo. And on -site disposal in
<br />existing pit, 1.0 ft. X 2 ft.- Max.
<br />Footers
<br />52
<br />10,000 ft haul
<br />52
<br />LF
<br />$ 6.41
<br />$ 333.32
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Explosives storage - 2 magazinec
<br />2X853.3
<br />Max. 10,000 ft. haul
<br />1,707
<br />CF
<br />$ 0.17
<br />$ 286.78
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Explosives storage trader
<br />2,560
<br />Max. 10,000 ft. haul
<br />2,560
<br />CF
<br />$ 0.17
<br />$ 430.08
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />2 Large Explosives Magazines
<br />2X22.5X8X6
<br />Max. 10,000 ft. haul
<br />2,160
<br />CF
<br />$ 0.17
<br />$ 362.88
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />5 Caro Containers
<br />5X25 and 8X8
<br />Max. 10,000 ft. haul
<br />8,000
<br />CF
<br />$ 0.17
<br />$ 1,344.00
<br />Queen Anne Dragline Repair
<br />Floor, concrete, demoliton only,
<br />Pad
<br />O'Lx7O'Wx.67"1
<br />average reinforcing -8 in. thick
<br />4,900
<br />SF
<br />$ 2.07
<br />$ 10,143.00
<br />Radio Tower -Skid Mounted
<br />NA
<br />USER PROVIDED ITEM
<br />1
<br />EA
<br />$ 600.00
<br />$ 600.00
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Bury Bone Yard Storage Materii
<br />84,000
<br />Max. 10,000 ft. haul
<br />84,000
<br />CF
<br />$ 0.17
<br />$ 14,112.00
<br />Powedine or telephone line,
<br />Lift Poles and Lights
<br />30 Poles
<br />overhead, wood -Single pole
<br />1,500
<br />LF
<br />$ 2.60
<br />$ 3,897.00
<br />Waste Oil & Antifreeze drum
<br />50 used oil,
<br />disposal
<br />20 solvent
<br />Solid pickup -55 gal. drums
<br />70
<br />EA
<br />$ 225.00
<br />$ 15,750.00
<br />Waterlines and Waste Solvent
<br />Shop to waste
<br />Lines
<br />oil pad
<br />Trapper Estimated
<br />1
<br />EA
<br />$ 2,318.00
<br />$ 2,318.00
<br />Floor, concrete, demoliton only,
<br />Transformer Pad
<br />225
<br />average reinforcing -4 in. thick
<br />225
<br />SF
<br />$ 1.03
<br />$ 231.75
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />4 skid mounted substations
<br />4'X10', 8'X20'
<br />Max. 10,000 ft. haul
<br />6,400
<br />CF
<br />$ 0.17
<br />$ 1,075.20
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />East Panel RL Coverall Building
<br />86,400
<br />Max. 10,000 ft. haul
<br />86,400
<br />CF
<br />$ 0.17
<br />$ 14,515.20
<br />Floor, concrete, demoliton only,
<br />East Panel RL Concrete Slabs
<br />4,540
<br />average reinforcing -10 in, thick
<br />4,540
<br />SF
<br />$ 2.58
<br />$ 11,713.20
<br />Demo. And on -site disposal in
<br />existing pit, 1.5 ft. X 2 ft.- Max.
<br />East Panel RL Footings
<br />60
<br />10,000 ft. haul
<br />600
<br />LF
<br />$ 9.60
<br />$ 5,760.00
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut_
<br />3X50,000 gal. Tanks
<br />20,040
<br />Max. 10,000 ft. haul
<br />20,040
<br />CF
<br />$ 0.17
<br />$ 3,366.72
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />M CI Tank @ H Impoundment
<br />10,000 gal.
<br />Max. 10,000 ft. haul
<br />1,005
<br />CF
<br />$ 0.17
<br />$ 168.84
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Red Silo Q ussed oil storage are
<br />15,000 gal.
<br />Max. 10,000 ft. haul
<br />1,600
<br />CF
<br />$ 0.17
<br />$ 268.80
<br />Total
<br />I
<br />I
<br />$ 909,768.39