Laserfiche WebLink
Table A-9.1 <br />Summary of topsoil replacement costs <br />Topsoil Replacement <br />Ave. Fleet <br />Cubic <br />Rate <br />Scraper/Trucl Fleet <br />Cost <br />Total <br />Area <br />Yards <br />(cyds/hr) <br />Hours <br />Hours <br />($/hr) <br />($) <br />Ash Pit <br />272,008 <br />189 <br />1435.7 <br />229.7 <br />$ 3,052.76 <br />$ <br />701,263.00 <br />D/E Pit <br />485,113 <br />266 <br />1823 <br />383.4 <br />$ 2,763.46 <br />$ <br />1,059,430.81 <br />ZS Pit <br />269,314 <br />176 <br />1531 <br />191.4 <br />$ 3,452.17 <br />$ <br />660,759.81 <br />F Pit <br />193,761 <br />234 <br />828.6 <br />266.6 <br />$2,563.45 <br />$ <br />683, 320.14 <br />AE Pit <br />527,544 <br />220 <br />2394.6 <br />552.9 <br />$ 3,023.70 <br />$ <br />1,671,782.92 <br />KLM Pits <br />791,017 <br />186 <br />4253.9 <br />595.1 <br />$ 3,176.96 <br />$ <br />1,890,577.54 <br />West Panel <br />236,710 <br />284 <br />834.0 <br />196.0 <br />$ 3,452.17 <br />$ <br />522,702.92 <br />East Panel <br />340,887 <br />192 <br />1777.4 <br />375.0 <br />$ 2,956.10 <br />$ <br />1,108,575.82 <br />Sub Total <br />3,116,354 <br />209 <br />14878.4 <br />2,790.1 <br />$2,974.261 <br />$ <br />8,298,412.96 <br />Topsoil Piles <br />59,209 <br />Topsoil that remains for <br />the pile's dist. <br />area and is not hauled. <br />Total <br />3,175, 563 <br />Page No. 23 <br />