Laserfiche WebLink
Table A-4.1 <br />Regrading Pits- Ash Pit (Dozer) <br />Page No. <br />11 <br />Push <br />Productivity Correction <br />Productivity <br />Dozer <br />Unit Cost <br />Total <br />Ash Pit <br />Cubic Yards <br />Distance <br />(icy/hr) <br />Factor <br />(Icy/hr) <br />Hours <br />($/hr) <br />Cost($) <br />Cross Section <br />Cross Section 1 <br />6862 <br />430 <br />700 <br />0.82 <br />576 <br />11.9 <br />$ <br />381.07 <br />$ <br />4,543.11 <br />Cross Section 2 <br />46277 <br />337 <br />900 <br />0.82 <br />740 <br />62.5 <br />$ <br />381.07 <br />$ <br />23,829.98 <br />Cross Section 3 <br />42234 <br />189 <br />1550 <br />0.82 <br />1274 <br />33.1 <br />$ <br />381.07 <br />$ <br />12,627.91 <br />Cross Section 4 <br />62950 <br />291 <br />1010 <br />0.82 <br />830 <br />75.8 <br />$ <br />381.07 <br />$ <br />28,885.20 <br />Cross Section 5 <br />66376 <br />276 <br />1060 <br />0.82 <br />872 <br />76.2 <br />$ <br />381.07 <br />$ <br />29,020.59 <br />Cross Section 6 <br />27940 <br />169 <br />1750 <br />0.82 <br />1439 <br />19.4 <br />$ <br />381.07 <br />$ <br />7,399.28 <br />Subtotal <br />252639 <br />269 <br />1166.7 <br />0.82 <br />959 <br />279.0 <br />$ <br />381.071 <br />$ <br />106,306.07 <br />