My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-31_PERMIT FILE - C1981010A (18)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2015-08-31_PERMIT FILE - C1981010A (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 10:12:03 AM
Creation date
10/9/2015 12:42:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
8/31/2015
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix A Reclamation Cost Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br />Bonding <br />Talpac Haul Simulations t -0 � j <br />Regrade Cross-Sections��Ili}r'" <br />Table of Contents <br />Table <br />Description <br />Page No. <br />Table A-1.1 <br />Summary of Costs for Trapper Mine Bond Determination <br />1 <br />Table A-2.1 <br />Fleet Cost - Regrading Pits <br />2 <br />Table A-2.2 <br />Drill and Blast Equipment Costs <br />3 <br />Table A-2.3. <br />Equipment costs for Regrading Roads <br />4 <br />Table A-2.4 <br />Impoundment Regrade Equipment Costs <br />5 <br />Table A-2.5 <br />Regrading Diversions <br />6 <br />Table A-2.6 <br />Topsoil replacement fleet costs <br />7 <br />Table A-2.7 <br />Revegetation Unit Costs <br />8 <br />Table A-2.8 <br />Dozer Correction Factors <br />9 <br />Table A-3.1 <br />Summary of regrade costs <br />10 <br />Table A-4.1 <br />Regrading Pits- Ash Pit (Dozer) <br />11 <br />Table A-4.2 <br />Regrading Pits - D/E Pits (Dozer) <br />12 <br />Table A-4.3 <br />Regrading Pits - K/Gd Pits (Dozer) <br />13 <br />Table A-4.4 <br />Regrading Pits - K/Gd Pits (Truck/Trackhoe) <br />14 <br />Table A-4.5 <br />Regrading Pits - AE Pit (Dozer) <br />15 <br />Table A-5.1 <br />Drill & Blast (Highwall Reduction) <br />16 <br />Table A-6.1 <br />Regrade Roads <br />17 <br />Table A-6.2 <br />Regrade Roads (Cont.) <br />18 <br />Table A-7.1 <br />Regrade Impoundments (Volumes) <br />19 <br />Table A-7.2 <br />Regrade Impoundments (Volumes) <br />20 <br />Table A-8.1 <br />Regrade Diversions <br />21 <br />Table A-8.2 <br />Regrade Diversions (cont.) <br />22 <br />Table A-9.1 <br />Summary of topsoil replacement costs <br />23 <br />Table A-10.1 <br />Calculations for time required for topsoiling - Ash Pit <br />24 <br />Table A-10.2 <br />Calculations for time required for topsoiling - D/E Pits <br />25 <br />Table A-10.3 <br />Calculations for time required for topsoiling - Zs Pit <br />26 <br />Table A-10.4 <br />Calculations for time required for topsoiling - F Pit <br />27 <br />Table A-10.5 <br />Calculations for time required for topsoiling - AE Pit <br />28 <br />Table A-10.6 <br />Calculations for time required for topsoiling - KLM Pits <br />29 <br />Table A-10.7 <br />Calculations for time required for topsoiling - West Panel <br />30 <br />Ponds, BC Road and Shop <br />Table A-10.8 <br />Calculations for time required for topsoiling - East Panel Ponds <br />31 <br />& A Road <br />Table A-11.1 <br />Summary of estimated revegetation quantities and costs. <br />32 <br />Table A-12.1 <br />Demolition - Structures <br />33 <br />Table A-12.1 <br />Demolition - Structures <br />34 <br />Table A-12.1 (Cont.) <br />Demolition - Structures <br />35 <br />Table A-12.2 <br />Culvert Removal and Disposal <br />36 <br />Table A-12.2 <br />Culvert Removal and Disposal <br />37 <br />Table A-12.3 <br />Haul Road Culvert Sizing. <br />38 <br />Table A-13.1 <br />Miscellaneous Cost Summary <br />39 <br />Table A-13.2 <br />Miscellaneous Cost Summary <br />40 <br />Table A-13.3 <br />Pond Cleaning During Liability Period <br />41 <br />Table A-13.4 <br />Borehole Sealing Work <br />42 <br />Table A-13.4 <br />Borehole Sealing Work <br />43 <br />Table A-13.4 <br />Borehole Sealing Work <br />44 <br />Table A-13.5 <br />Sealing Exploration Drill Holes <br />45 <br />Table A-13.6 <br />Landslide Monitoring Stations <br />46 <br />Table A-13.7 <br />Seal 4 Monitoring Wells (MR217) <br />47 <br />Table A-14.1 <br />Equipment Mobilization/Demobilization <br />48 <br />Table A-14.1 <br />Equipment Mobilization/Demobilization <br />49 <br />Talpac Haul Simulations t -0 � j <br />Regrade Cross-Sections��Ili}r'" <br />
The URL can be used to link to this page
Your browser does not support the video tag.