Laserfiche WebLink
'0',000'.000�-� <br />'�00 <br />OXBOW MINING LLC <br />THIRD QUARTER 2015 POND INSPECTION REPORT <br />Pond Inspection Date: September 29, 2015 <br />Miscellaneous Comments: <br />1. The SWMP control devices were inspected and all SWMP control devices were found to be in fair <br />condition. Routine quarterly maintenance to sumps was conducted. <br />2. Sediment and Water Level Determination — When sediment enters a pond, it is deposited unevenly, <br />usually collecting at the inlets rather than evenly across the bottom of the pond. Reported sediment levels <br />are based upon the inspector's observations made throughout the quarter during routine inspections in <br />combination with knowledge of the pond structure. The reported pond water level is also determined by <br />observations relative to the various landmarks in the pond (depth to bottom, primary riser, etc.) <br />Notwithstanding comments above, ponds have been maintained as designed and in accordance with the <br />approved plan. <br />l; <br />Inspected By: <br />James A. Kiger �— <br />off```-,./s <br />d <br />Under Direction of <br />Colorado <br />Professional Engineer No. 34286 <br />a� <br />r <br />3737 Hwy 133 o P.O. Box 535 • Somerset, Colorado 81 434 USA <br />TEL (970) 929-5122 -4 FAX (970) 929-5177 <br />