Laserfiche WebLink
A <br />0 <br />n <br />U <br />Table 4.9-2-1 Trapper Mine topsoil pile inventory (1) <br />Topsoil Coordinates Size Approximate Created <br />Pile ID Location North East (acres) CYDS Date <br />Al <br />A field coal pile <br />409,850 <br />1,411,300 <br />1.3 <br />12,944 <br />6/77 <br />A10 <br />A pit scraper pit (East) <br />404,400 <br />1,425,250 <br />2.3 <br />54,090 <br />1989 <br />A4 <br />GB well site <br />410,070 <br />1,417,400 <br />0.5 <br />7,805 <br />pre 1970 <br />A6 <br />North A pit sandrocks <br />409,650 <br />1,421,100 <br />3.2 <br />104,628 <br />1/86 <br />A8 <br />MR -111 Relocate MP6 & AB (1991) <br />410,700 <br />1,421,720 <br />5.2 <br />157,140 <br />1991 <br />ARdT <br />A Pit Mid -Ramp Push -Back Pile <br />410,160 <br />1,423,950 <br />0.1 <br />1,960 <br />1992 <br />AS -93-1 <br />A pit South #1 <br />406,550 <br />1,426,040 <br />3.9 <br />86,454 <br />1993 <br />ASH1 <br />Johnson Gulch East Tributary <br />408,000 <br />1,421,200 <br />3.9 <br />97,092 <br />1992 <br />ASH2 <br />Johnson Gulch East Tributary <br />408,200 <br />1,422,000 <br />1.6 <br />27,486 <br />1992 <br />B2 <br />B pit (E. Buzzard drainageway) <br />410,250 <br />1,409,950 <br />5.B <br />19,260 <br />1989 <br />B3 <br />B pit north of B2 <br />410,850 <br />1,408,750 <br />2.2 <br />60,606 <br />1990 <br />BUZ92-1 <br />Far East Buzzard Pond #1 <br />411,100 <br />1,410,250 <br />0.5 <br />882 <br />1992 <br />CG1 <br />Coyote Gulch <br />411,050 <br />1,412,200 <br />4.8 <br />49,095 <br />5/1978 <br />D1 <br />Upper D Pit <br />401,350 <br />1,409,300 <br />4.8 <br />174,000 <br />12/77 <br />DPI <br />Deer Pond #1 <br />400,700 <br />1,417,650 <br />0.5 <br />21,082 <br />1992 <br />DR2T3 <br />D ramp #3 anfo add-on <br />404,100 <br />1,417,150 <br />0.3 <br />8,788 <br />6/85 <br />DS2 <br />S. D Pit Substation (Ramp #1) <br />402,910 <br />1,417,160 <br />0.2 <br />835 <br />1991 <br />DS3 <br />D Pit Substation Addition <br />404,260 <br />1,414,4650 <br />0.1 <br />188 <br />1991 <br />DT1 <br />D pit temp N. <br />405,500 <br />1,413,100 <br />1.1 <br />7,436 <br />12/1987 <br />DT2 <br />D pit temp middle <br />404,800 <br />1,413,350 <br />0.4 <br />9,504 <br />1988 <br />DT3 <br />D pit temp S. <br />403,300 <br />1,413,400 <br />0.8 <br />12,024 <br />1988 <br />DT4 <br />D pit (E. og DT3--Ramp2 elev) <br />403,100 <br />1,413,650 <br />1.3 <br />26,028 <br />1989 <br />DT5 <br />Temporary Pile Near DT4 <br />403,150 <br />1,414,410 <br />1.3 <br />10,422 <br />1991 <br />E1 <br />E pit SE pile small <br />402,450 <br />1,422,700 <br />0.8 <br />10,000 <br />12/78 <br />- Ell <br />E pit Ute Gulch <br />402,100 <br />1,420,100 <br />0.2 <br />1,100 <br />1989 <br />E12 <br />E pit regrade pile <br />403,850 <br />1,422,350 <br />4.2 <br />73,278 <br />1987 <br />E2 <br />Middle E pit pile <br />404,400 <br />1,423,100 <br />4.6 <br />25,238 <br />12/78 <br />E4 <br />E pit SE pile large <br />401,900 <br />1,422,650 <br />2.9 <br />34,010 <br />pre 12/79 <br />E6 <br />Castor Gulch road E pit pile <br />401,200 <br />1,420,950 <br />8.9 <br />208,968 <br />pre 12/79 <br />E7 <br />Eramp road <br />403,450 <br />1,417,650 <br />1.6 <br />16,478 <br />12/79 <br />N, E8 & E9 <br />S curve pile East (several add-ons) <br />406,000 <br />1,418,150 <br />3.2 <br />91,587 <br />pre 1979 <br />EBI <br />East Buzzard Gulch <br />411,100 <br />1,409,720 <br />0.5 <br />4,224 <br />pre 87 <br />EG1 <br />Elk dam <br />401,200 <br />1,414,920 <br />0.1 <br />1,027 <br />12/87 <br />EMI <br />E. of Explosive Magazine <br />411,300 <br />1,414,300 <br />0.5 <br />5,456 <br />6/80 <br />cont. <br />2194 <br />0 <br />