Laserfiche WebLink
POND INSPECTION FORMS <br /> OPERATOR: PEABODY SAGE CREEK MINING,LLC. <br /> MINE: PEABODY SAGE CREEK MINE <br /> DATE OF INSPECTION: 9/22/2015 <br /> SEDIMENT POND ID: Truck Wash Settling Pond <br /> REFERENCE ELEVATIONS Riser Crest Outlet Top of Enbankment Emergency Spillway <br /> (ft): - - - N/A <br /> COMMENTS: <br /> OPERATIONAL STATUS AT ApproximateWater Level Pond Capacity/Required Capacity(acre-ft) <br /> TIME OF INSPECTION: DRY N/A <br /> COMMENTS: Not a sediment pond <br /> Differencial Inadequate Outlet Channel <br /> Burrows Other <br /> STRUCTURAL: Settling Vegetation Erosion <br /> NONE NO NONE NONE NO <br /> COMMENTS: <br /> Defective Dewatering Device Faulty Gates, <br /> APPURTENANT Other <br /> Spillways Clogged Baffles,Pumps <br /> STRUCTURES: N/A N/A N/A NONE <br /> COMMENTS: <br /> ADDITIONAL COMMENTS: Structure has been maintained as designed and in accordance with the <br /> approved plan and the applicable regulations. <br /> MAINTENANCE REQUIRED: No other aspects of the structure are affecting stability or require any <br /> maintenance. <br /> INSPECTOR NAME: B. Scott Cowman (Senior Environmental Specialist), Mike Berdine (P.E.) <br /> sgc_engineering(\\sgcenl)N:SAGE CREEK/ENVIRON MENTAL/Permitting/DRMS 5MCRA Mine Permit/Pond Inspections <br />