Laserfiche WebLink
POND INSPECTION FORMS <br /> OPERATOR: PEABODY SAGE CREEK MINING, LLC. <br /> MINE: PEABODY SAGE CREEK MINE <br /> DATE OF INSPECTION: 9/22/2015 <br /> SEDIMENT POND ID: Portal Sump 1(upper north) <br /> REFERENCE ELEVATIONS Riser Crest Outlet Top of Enbankment Emergency Spillway <br /> (ft): N/A Pump - N/A <br /> COMMENTS: <br /> OPERATIONAL STATUS AT Approximate Pond Capacity/Required Capacity(acre-ft) <br /> Water Level <br /> TIME OF INSPECTION: COMMENT N/A <br /> COMMENTS: Water approximately 4' below cuvert <br /> Differential Inadequate Outlet Channel <br /> Burrows Other <br /> STRUCTURAL: Settling Vegetation Erosion <br /> N/A N/A N/A NONE NO <br /> COMMENTS: <br /> Defective Dewatering Device Faulty Gates, <br /> APPURTENANT Other <br /> Spillways Clogged Baffles, Pumps <br /> STRUCTURES: N/A N/A N/A NONE <br /> COMMENTS: <br /> ADDITIONAL COMMENTS: <br /> MAINTENANCE REQUIRED: No other aspects of the structure are affecting stability or require any <br /> maintenance. <br /> INSPECTOR NAME: B. Scott Cowman (Senior Environmental Specialist), Mike Berdine (P.E.) <br /> sgc_engineering(\\sgcenl)N:SAGE CREEK/ENVIRON MENTAL/Permitting/DRMS SMCRA Mine Permit/Pond Inspections <br />