Volume IX - GOB PILE #2
<br />APPENDIX A
<br />Coal Mine Waste Disposal Area
<br />Salvage Volumes
<br />Coverfill Pile
<br />Initial 50 Foot Bench
<br />_
<br />*Topsoil
<br />Topsoil
<br />Depth Ft.
<br />CY
<br />-
<br />- -
<br />-
<br />2233 - - 1.22 4,453
<br />3.9, 1.2 7,550
<br />-
<br />-
<br />-
<br />_ -
<br />Second 50 Foot Bench
<br />-
<br />- 7.7 1.2 14,907
<br />Third 50 Foot Bench _
<br />Fourth 50 Foot Bench
<br />5.8 1.2 11,229
<br />2.91 1.2 5,614
<br />Top of Pile
<br />2.3
<br />1.2 4,453
<br />Gob Pile #4
<br />7.4
<br />0.58 6,924,
<br />Gob Pile #1
<br />2.7
<br />0.5 2,178
<br />Gob #2 West Expansion
<br />1.8
<br />1.21 3,485'
<br />Gob #2 Expansion -TR76
<br />6.1
<br />1.2 11,810
<br />(Fill in Draw Between Pile #2
<br />and #4)
<br />Area between gob #1 "
<br />__- 1
<br />1.2 1,742
<br />Topsoil Stockpile E
<br />0.91
<br />Totals
<br />43.80
<br />---
<br />_ 74,346i(Esbmaled ua /ue, notaaua
<br />/ymstndpde)
<br />Reclamation
<br />Volumes
<br />Topsoil Topsoil From Cover (Regd)i
<br />Area
<br />Acres
<br />Depth Ft.
<br />CY
<br />Stockpile
<br />CY
<br />Reclamation Areas
<br />0.50
<br />3,896
<br />Gob #4 (West Half)
<br />4.83
<br />3,896
<br />27,273
<br />First Bench Pile #2
<br />4.41
<br />0.50
<br />3,557
<br />3,557
<br />24,902,
<br />Second Bench Pile #2
<br />5.10
<br />0.50
<br />4,114
<br />4,114
<br />28,798
<br />Third Bench Pile #2
<br />7.45
<br />0.50
<br />6,010
<br />6,010
<br />42,068,
<br />Fourth Bench Pile #2
<br />8.02.
<br />0.50
<br />6,469
<br />6,469
<br />45,286'
<br />Fifith Bench Pile #2
<br />8.28 0.50
<br />6,679
<br />6,679
<br />46,754
<br />Top of Pile Pile #2
<br />7.39 0.50
<br />5,961
<br />5,961
<br />Coverfill
<br />gob Pile #1
<br />-
<br />230 0.50
<br />_ _ _ _ 112 _ _ _ 0.50
<br />_ _ 0.9 0.50
<br />-
<br />_ 1,855
<br />903
<br />1,855
<br />903
<br />_41,729
<br />_ n/a
<br />6,324
<br />_
<br />Area between gob #1 &
<br />726
<br />726
<br />n/a
<br />Topsoil Stockpile E
<br />Total:
<br />49.80,
<br />40,172
<br />40,172
<br />263,135
<br />Coverfill Ma- terial Balance:
<br />- _- -
<br />_ -_
<br />--
<br />Coverfill currently in -Place
<br />55,055
<br />Coverfill in stockpile, available for reclamation
<br />92,937
<br />Coverfill to be borrowed to complete reclamation
<br />115,143
<br />Total:
<br />263,135
<br />1 In -Place
<br />Required
<br />Amount
<br />CY
<br />Coverfll In- Place:
<br />24,902,
<br />_ 23,829
<br />6,324,
<br />Bench #1
<br />Gob #2 Benches 2/3/4
<br />Gob Pile #1
<br />-- -- - - - - --
<br />- --
<br />- Subtotal:
<br />55, OStCoverfi //a/ia3dymplace(3.5'deptli)-
<br />-
<br />Coverfill Available for reclamation:
<br />COVERFILL PILE -West
<br />35,000
<br />In Stockpile
<br />Coverfill Pile -East
<br />44,537
<br />In Stockpile
<br />Top of Gob Pile #4
<br />13,400
<br />Subtotal:
<br />92,937
<br />Coverfill Necessary to complete reclamation:
<br />TR -79 Excess Coverfill (to be salvaged)
<br />14,000,
<br />Topsoil
<br />_
<br />From Gob Pile #3 Area (to be salvaged)
<br />58,943
<br />Estimate
<br />Adjacent Borrow area #1 - Gob Pile #2 area
<br />7,200
<br />Adjacent Borrow area #2 - Gob Pile #2 area
<br />30,000
<br />Adjacent Borrow area #3 _ Gob Pile #2 area l 5,000
<br />- -- - Tota1 115.143
<br />-
<br />--
<br />- --
<br />- - -� Topsoil
<br />In- Place;
<br />Volume Salvaged
<br />CY
<br />TOPSOIL PILED
<br />4,524 In -Place
<br />TOPSOIL PILE E
<br />37,948 In -Place
<br />Total:
<br />42472
<br />UNIFORM TOPSOIL DEPTH ASSUMED IN ORDER 70 MATCN QUA N 77TY 04L CUL 17E
<br />VALUESAREESUMATED AND LIMYDIFFERENTFROMIN -FIELDCONDMOM
<br />PLEASESEEVOLUMEM 5=11= IRECL AMATION " FOR ADISMSSIONOFTHEML✓AC,Evs. ACTUAL TOPSOIL VALUES
<br />MR -162 App A -1 09/14
<br />
|