Laserfiche WebLink
Volume IX - GOB PILE #2 <br />APPENDIX A <br />Coal Mine Waste Disposal Area <br />Salvage Volumes <br />Coverfill Pile <br />Initial 50 Foot Bench <br />_ <br />*Topsoil <br />Topsoil <br />Depth Ft. <br />CY <br />- <br />- - <br />- <br />2233 - - 1.22 4,453 <br />3.9, 1.2 7,550 <br />- <br />- <br />- <br />_ - <br />Second 50 Foot Bench <br />- <br />- 7.7 1.2 14,907 <br />Third 50 Foot Bench _ <br />Fourth 50 Foot Bench <br />5.8 1.2 11,229 <br />2.91 1.2 5,614 <br />Top of Pile <br />2.3 <br />1.2 4,453 <br />Gob Pile #4 <br />7.4 <br />0.58 6,924, <br />Gob Pile #1 <br />2.7 <br />0.5 2,178 <br />Gob #2 West Expansion <br />1.8 <br />1.21 3,485' <br />Gob #2 Expansion -TR76 <br />6.1 <br />1.2 11,810 <br />(Fill in Draw Between Pile #2 <br />and #4) <br />Area between gob #1 " <br />__- 1 <br />1.2 1,742 <br />Topsoil Stockpile E <br />0.91 <br />Totals <br />43.80 <br />--- <br />_ 74,346i(Esbmaled ua /ue, notaaua <br />/ymstndpde) <br />Reclamation <br />Volumes <br />Topsoil Topsoil From Cover (Regd)i <br />Area <br />Acres <br />Depth Ft. <br />CY <br />Stockpile <br />CY <br />Reclamation Areas <br />0.50 <br />3,896 <br />Gob #4 (West Half) <br />4.83 <br />3,896 <br />27,273 <br />First Bench Pile #2 <br />4.41 <br />0.50 <br />3,557 <br />3,557 <br />24,902, <br />Second Bench Pile #2 <br />5.10 <br />0.50 <br />4,114 <br />4,114 <br />28,798 <br />Third Bench Pile #2 <br />7.45 <br />0.50 <br />6,010 <br />6,010 <br />42,068, <br />Fourth Bench Pile #2 <br />8.02. <br />0.50 <br />6,469 <br />6,469 <br />45,286' <br />Fifith Bench Pile #2 <br />8.28 0.50 <br />6,679 <br />6,679 <br />46,754 <br />Top of Pile Pile #2 <br />7.39 0.50 <br />5,961 <br />5,961 <br />Coverfill <br />gob Pile #1 <br />- <br />230 0.50 <br />_ _ _ _ 112 _ _ _ 0.50 <br />_ _ 0.9 0.50 <br />- <br />_ 1,855 <br />903 <br />1,855 <br />903 <br />_41,729 <br />_ n/a <br />6,324 <br />_ <br />Area between gob #1 & <br />726 <br />726 <br />n/a <br />Topsoil Stockpile E <br />Total: <br />49.80, <br />40,172 <br />40,172 <br />263,135 <br />Coverfill Ma- terial Balance: <br />- _- - <br />_ -_ <br />-- <br />Coverfill currently in -Place <br />55,055 <br />Coverfill in stockpile, available for reclamation <br />92,937 <br />Coverfill to be borrowed to complete reclamation <br />115,143 <br />Total: <br />263,135 <br />1 In -Place <br />Required <br />Amount <br />CY <br />Coverfll In- Place: <br />24,902, <br />_ 23,829 <br />6,324, <br />Bench #1 <br />Gob #2 Benches 2/3/4 <br />Gob Pile #1 <br />-- -- - - - - -- <br />- -- <br />- Subtotal: <br />55, OStCoverfi //a/ia3dymplace(3.5'deptli)- <br />- <br />Coverfill Available for reclamation: <br />COVERFILL PILE -West <br />35,000 <br />In Stockpile <br />Coverfill Pile -East <br />44,537 <br />In Stockpile <br />Top of Gob Pile #4 <br />13,400 <br />Subtotal: <br />92,937 <br />Coverfill Necessary to complete reclamation: <br />TR -79 Excess Coverfill (to be salvaged) <br />14,000, <br />Topsoil <br />_ <br />From Gob Pile #3 Area (to be salvaged) <br />58,943 <br />Estimate <br />Adjacent Borrow area #1 - Gob Pile #2 area <br />7,200 <br />Adjacent Borrow area #2 - Gob Pile #2 area <br />30,000 <br />Adjacent Borrow area #3 _ Gob Pile #2 area l 5,000 <br />- -- - Tota1 115.143 <br />- <br />-- <br />- -- <br />- - -� Topsoil <br />In- Place; <br />Volume Salvaged <br />CY <br />TOPSOIL PILED <br />4,524 In -Place <br />TOPSOIL PILE E <br />37,948 In -Place <br />Total: <br />42472 <br />UNIFORM TOPSOIL DEPTH ASSUMED IN ORDER 70 MATCN QUA N 77TY 04L CUL 17E <br />VALUESAREESUMATED AND LIMYDIFFERENTFROMIN -FIELDCONDMOM <br />PLEASESEEVOLUMEM 5=11= IRECL AMATION " FOR ADISMSSIONOFTHEML✓AC,Evs. ACTUAL TOPSOIL VALUES <br />MR -162 App A -1 09/14 <br />