BULLDOZER RIPPING WOK&
<br />1 aNk aesa►iptiO,,: Rip stockpile area and temporary access
<br />131 eeLe 15a3iu .Saud St G1 avel YCiuiit ACt,u,,:
<br />5itc: Yit 2U 1.)-0911npectiou Ye,n,it/Jobt M2008022
<br />PROJELT H)ENTIFIuATION
<br />Task #: 03A State: Colorado Abb,eviatim,: Nmic_
<br />Dar: 921 2015 County: Moffat Pile„a...e: MULL-Wa
<br />Wei: AC Y
<br />Agency or organization name: DRMS
<br />HOURLY EQUIPMENT LOST
<br />Basic Machine: Cat D8T - 8U
<br />Ripper Attachment: 3 -Shank Ripper
<br />Cost Breakdown:
<br />OW..e.ship Cu3tfflou,
<br />Opc,atn,g Co3t/Huu,
<br />Kippel Vp'c.atu.g t:Ost/rivu.
<br />VEC,aty, C,Obt/tiOu,
<br />1 utal Unit Cr,3t/tivu,
<br />1 Otal Pfeet cost/Hou,
<br />MATERIAL QUANTITIES
<br />Alte,nate MCUICUb:
<br />Horsepower:
<br />Shift Basis:
<br />Data Suu.ix:
<br />Ut,li"atYu„ %
<br />INA
<br />$108.22 1 UU
<br />$ i.45 l uu
<br />$.s s.0 1 NA
<br />$LLL. l.i
<br />$222.73
<br />Selected estimating method: Area
<br />310
<br />I per day
<br />(CRG)
<br />Set3...ie: NA Bank Volu,,x: NA
<br />Area: /.Ou aC,a3 Kit, i)epth (fty 2.u5
<br />Source of estimated quantity: Based on site inspection
<br />HOURLY PRODUCTION
<br />Se,s,,,,c:
<br />Seismic Velocity: NA
<br />Area:
<br />AvC.agc K,ppu.g i-mptn:
<br />Aveiagc Kipping Wiatn:
<br />Ave,age Ripping Length:
<br />Average Dozer Speed:
<br />Average Maneuver Time:
<br />Production per ,.nit a.ea:
<br />Job Condition Correction Factors
<br />U,.aaju3tca P10u,ly Unit Y,OC1uCt,uu:
<br />Site Altitude:
<br />Altitude Adj:
<br />.fob t1t,Cic„cy:
<br />Net Correction:
<br />A9ju3tcd HiJu,ly U,,,t Y,vauCt,Ou:
<br />AajubtCa Hou►ly Pleet Y,O&CtiOu:
<br />JOB TIME AND COST
<br />P lucct 5,c: 1 lit aac, (b)
<br />Unit CObt: $525.4.)4 Fei aC,e
<br />2..)5
<br />7.08
<br />500.00
<br />88.00
<br />0.25
<br />0.822
<br />0.83
<br />0.68
<br />0.68
<br />I otal job t1111e:
<br />1 otal job cost:
<br />til. Y
<br />vulu,,,C:
<br />NA
<br />feet/second
<br />,,,l.r n
<br />degrees
<br />feet
<br />feet
<br />feet
<br />aC, G3/hou,
<br />AC, M/nr
<br />feet
<br />((-Al htf)
<br />(1 bnilt/aay)
<br />multiplier
<br />AC►eb fir
<br />Acres hr
<br />10.26
<br />$2285
<br />Hours
<br />CIRCES Co„ Estimating Software
<br />
|