Laserfiche WebLink
lvtobiliaatioll wollcsneet Cont'd Task # 06B <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Tow., withi„ puiect area irgiou: <br />Total vie -way travel distance: <br />Average gravel Speed: <br />1 otal 1vo11-Koadab1e Mob/Demob Cost * <br />' * two 1 ound trips with haul rig: <br />1 otal Roadable Mob/Demob Cost ** <br />** one round trip, no haul ,ig: <br />Transportation Cycle Timc: <br />Haul Time (Hours): <br />Return Time (Hou,3): <br />Loading Ti ... c (Hou.,): <br />Unloadi.,g Ti..1e (rivu,$): <br />Subtotals: <br />JuB TIME AND COST <br />Non- <br />Roadable <br />Roadable <br />Equipment <br />Equip,,,e„t <br />0.14 <br />u.14 <br />U.14 <br />0.14 <br />u.�u <br />NA <br />u. -*)0 _ <br />NA <br />1.29 <br />0.29 <br />Total j—vb tii,e: <br />1 otal fob cobt'. <br />Page 2 of 2 <br />CRAIG <br />5.00 ,1,i1e3 <br />35.00 111pn <br />$8Izs.:)U <br />$9.31 <br />2.57 Hours <br />$828 <br />CIRCnS Cost E,tin sting Software <br />