Laserfiche WebLink
PUMPIN(i WORK <br />I ask description: Pit 5-Lovve, ..ate, level by 111 Leet <br />Site: Bu.... KauCn rit rermit Action: 2015-09 Inspection <br />PROJECT IDENTIFICATION <br />Task #: 02D State: coloiauu <br />Date: 9 22 2015 cuunty: mottat <br />User: ACY <br />Agency or organizaLOn namr: L)FLM5 <br />HOURLY V <br />Make and Model: Centrifugal pu.,,p - 20uM, 10 i,,. <br />Attachment 1: S..ctzm, pipe - lU ,,,. aim... LJ tt. <br />Attachment 2: i)i3chn,ge pipe - lU in. ll._ 25 ft. <br />Labo, u„it 1: rump upe,atu, <br />Horsepower: 70 <br />Shift Ba3i3: I pe, day <br />weight: 1.9J <br />(US 1 ons) <br />Cost ti, Cakaown: <br />_ Utilization °ro <br />uwnc,bnip Cubuhour: $22.02 MA <br />upe, sting Cost/Hour: $41.74 1 uU <br />Operator Cost/Hour: $22.49 NA <br />I v[al Unit C obmoUr: $86.25 <br />Total Fleet Cost/Hour: $86.z:) <br />PUMPING OUANTITiES <br />reimlviobg: M1980131 <br />Abbreviation: Nc;..e <br />Filena,,,c: M131-DAI <br />Initial Pond Volume: 40.00 <br />Conversion factor: 325850.5800 <br />Final Pond Volume: 1s,9s4,ut3.lu <br />gallo„s <br />Total Pond Inflow Surfacc <br />Unit inflow .nic i., <br />Area: l/.000 <br />5q. ft. <br />gph/sq. ft.: <br />Total Pond Inflow Vol...ne <br />pC, Hnu,: 2,988.5u <br />gallons <br />Source of estimated vo1.u,.C: Site n,a <br />ani t,e13 ebtin,ates (4 ac.) <br />PUMPING TIMItr; <br />Maximum Pump CapaCity: <br />100,00 <br />gph/pump <br />Esti...a cd Suctiu„ Head: <br />5 <br />feet <br />E3ti.natcd u13rna16C Head: <br />0 <br />feet <br />i utal tread: <br />5 <br />feet <br />C;Yti rump Capacity: <br />201,000 <br />gph/pun,p <br />Site Altitude: <br />6,200 <br />tett <br />Adju3ta'a rumpi11g Capacity: <br />402,000 <br />gph <br />Initial ullaHjuz-tea rumping Time: <br />32.42 <br />hou,3 <br />Intlow awing Initial Pumping: <br />96,899 <br />gallull, <br />Net Unadjusted Pumping Time: <br />JL.66 <br />riou,s <br />Altitude Adjustment Factu.: <br />0.940 <br />(310 rule) <br />Pump Eff.cic..Cy F.ctm: <br />0.9157 <br />(55 min. hr.) <br />Total Adju�tcd Yun,pi„g 1 is „C: <br />28.15 <br />hours <br />JOB Tl<1viE AND COST <br />I vtal job <br />time: 28.15 Ho.,. s <br />Unit cost: $0.000185 /Gallo., <br />1 otal job cost: $2428 <br />CIRCES Cvst E.timating Svltware <br />