Laserfiche WebLink
Task description: <br />Site: Bunn Ranch Pit <br />UUS I SUMMARY WORK <br />tceela„tation cost updated <br />re...ut ACt,Uu: 1015-09 Inspection Pc,,,,,t/JOUif: M1980131 <br />PROJECT IDENTIFICATION <br />TaSkTF: Out State: Colorado _ Abbreviation: None <br />Late: 9/1212015 County: Moffat Filename: M131 -u01 <br />Ube,: ACY <br />AgCiXy o1 uigauization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />ra�lc <br />Form <br />Description Used <br />Fleet <br />Size <br />1 rill <br />flours <br />Cost <br />uta <br />02a <br />02b <br />02C <br />Old <br />02cc <br />02f <br />Osa <br />04a <br />Ura <br />05b <br />Uba <br />07a <br />08a <br />Remove office building DEMOLISH <br />1 <br />1 <br />I <br />1 <br />1 <br />1 <br />1 <br />2 <br />L <br />2 <br />G <br />1 <br />1 <br />1 <br />3z.00 <br />$21;659.06 <br />$4,612.00 <br />$1,808.00 <br />$1,819.00 <br />$1428.00 <br />$6,05.06 <br />$67109.00 <br />$ I Y_U81.Uu <br />$12,862.00 <br />$15_:)y /.U0 <br />$9,104.00 <br />$SS_541.UU <br />$5,423.00 <br />$ / /1.u'u <br />Fit 2-1-0wCi Ovate, level by 10 feet Pu1v1r1NG <br />39.04 <br />Pit 3 -Lower water level by 1U feet PUMPING <br />ZU.95 <br />Fit 4- Lvwei wate, level by 10 feet FUMF1NG <br />21.09 <br />Pit 5 -Lower water le�cl by lu feet PUMPING <br />18.14 <br />Fit S-LUwci water level by 10 feet FUMr1NG <br />51.69 <br />Pit 9 -Lower wate. level by 1u teet PUMPING <br />1. / 1 <br />KeZluce all blo es to 3H:1 V or flatter 1JUGr,1C <br />37.60 <br />Rip compacted stockpile a..8 o1,e.atio„ areas RIPPER <br />L3. / 1 <br />1.a.lsl.rort topsoil from stockpiles LUA1JtK <br />52.65 <br />Distribute WF3Ml DOZER <br />l /.Y4 <br />xeve etate affected areas 11,tvLGE <br />40.00 <br />Mobllicc.ccla...at,o.. clew a„ a equipment MOBILIZE <br />1.11 <br />Setso„ Nary mobilize reclamation c.c. MOBILIZE <br />2.11 <br />SUBTOTALS: <br />420.75 <br />$ $142,022 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insura.,=: 2.01 <br />1 ota1= <br />$2.858.84 <br />Performa.,cc bc;,.d: 1.U.-) <br />1 otal = <br />$1,491.23 <br />Job sullc,,..t'c..Clc.,C 11U.00 <br />T otal = <br />$9,019.20 <br />r.ot,t: 10.00 <br />Total = <br />$14,202.20 <br />TOTAL O & P = <br />$27,581.47 <br />CON 1 KAC I AMOUNT (direct r O & P) = <br />$169,03.4 / <br />LEGAL -ENGINEERING - PRO.i tE 1 MANACitMENT: <br />Financial warranty process,„g (legalhulate8 cobtb): 500.00 Total = 300.00 <br />Engineering wo.k mid/n, contract/00 vicpa,ation: 0.00 1 otal = $0.00 <br />Reclamatim, ..,a..agui,.e..t a..a/o, administration: 5.00 $87480.17 <br />CONTINGENCY: 0.00 1 otal = $0.00 <br />1 D 1 AL 1NVIFLECT COST $36,561.64 <br />TOTAL 1sO1v10 AlvivUN r (direct + indirect) = $178,581.54 <br />