Laserfiche WebLink
Bulldozer Worksheet Cn..t'd <br />Spoil pile: <br />Push g.adie.it: <br />Altitude: <br />Material Weight: <br />ii lade type: <br />Net correction: 0.8593 <br />Adjusted unit production: 1,124.0 LEY/nr <br />Adj,.stcd fleet 1,.c;uuet;o..: L148.t LCY/hr <br />iOB TIME AND CuST <br />Fleet s -c: 2 vu,,e. (3) <br />Unit 0051: $0.2L6/LCY <br />Tutalwb t.u.c: 1 /.9ZI h(JUIS <br />1 etas goo evbt: $97104 <br />rage l at Z <br />1 ask # 05B <br />0.800 <br />(FND-RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAI tits) <br />1.4.sg <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.8593 <br />Adjusted unit production: 1,124.0 LEY/nr <br />Adj,.stcd fleet 1,.c;uuet;o..: L148.t LCY/hr <br />iOB TIME AND CuST <br />Fleet s -c: 2 vu,,e. (3) <br />Unit 0051: $0.2L6/LCY <br />Tutalwb t.u.c: 1 /.9ZI h(JUIS <br />1 etas goo evbt: $97104 <br />rage l at Z <br />