My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-05_REVISION - M1980131
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980131
>
2015-10-05_REVISION - M1980131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:45:28 AM
Creation date
10/5/2015 4:19:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980131
IBM Index Class Name
Revision
Doc Date
10/5/2015
Doc Name
Reclamation Cost Update & Notice of SI03
From
DRMS
To
Russell Larsen
Type & Sequence
SI3
Email Name
ACY
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLL)ULtK KIFFINCi WORK <br />Task desc. iptic;..: Kip compacted stockpile and ope. at;uui, a, eua <br />Site: Bunn Ranch Pit re,n,it Action: 2015-09 Inspectio.. ruinilviat)#: M1980131 <br />Area: <br />PROJECT EDENTIFICA ]JON <br />1 a5K It: 04A State: Colo,ado <br />Date: 9222015 County: MvrIat <br />User: ACY <br />Agency oi o,ga„ization name: DRMS <br />HOURLY EvUIPMEN1 CuST <br />tsa5ic Machine: Cat D9T - 9U <br />KippC, Attdrtime„ t: 3 -Shank Ripper <br />Cost ti,eakdown: <br />Ownership Cost/Hou,: <br />Operating Cost/Hou,: <br />Ripper Ope,ati„g Cu3vtiou,: <br />OPC,att7, C Ubt/tHOu1: <br />Total Unit Cost/Hou,: <br />I vial t luet C abvHour: <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Abbreviatic;..: None <br />M 1St -u4a <br />tlu,bepower: 405 <br />shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />$81.10 NA <br />$143.16 100 <br />$8.91_ IOD <br />$38.01 NA <br />Q,�1 1'7 <br />$542.33 <br />Scicetcd cc5ti,,,ati„g ,,,ethos: Area <br />NA tsank vvlun,e: NA BCY NA <br />30.00 acres Kip Depth (tt): 2.00 Volu...e: V5-900 BCY or CCY <br />Source of estimated quantity: Site maps a„s Statt estimates <br />HOURLY PRODUCTION <br />Seismic: <br />seismic Velocity: <br />NA <br />teev5econd <br />Area: <br />AvC,age Kipping Depth: <br />2.63 <br />,,,ph <br />Ave.age I(ippi,,g width: <br />7.67 <br />durpee5 <br />Ave.age Kipping Length: <br />100.00 <br />teet <br />Average Dozer Speed: <br />88.00 <br />Leet <br />Average Maneuver Time: <br />u.2.-) <br />feet <br />Productio.l pe, unit a, ea: <br />0.762 <br />acres/hvu, <br />sob Co.,ditio„ Collection Factors <br />Unadjusted tiou,ly u„it r,o3uction: <br />0.762 <br />AMC,, 111' <br />Site Altituse: <br />63200 <br />feet <br />Altituae Aaj: <br />1.00 <br />(CAI tits) <br />Jon Ett,aiellcy: <br />0.83 <br />(1 3hitv3ay) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted tiou,iy unit r,oduction• <br />0.63 <br />Ae,es hr <br />AdjuRCU Mu,ly rleet Production: <br />I.L6 <br />AU,eb hr <br />JOB TIME AND COST <br />Fleet size: 2 lnasel(5) <br />Total job time: <br />L3.7L Hours <br />Unit cost: $4.8.12-8 re, acre <br />Total job east: <br />$12862 <br />CIRCES Chs. Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.