Laserfiche WebLink
Mobili�atimu wu.k3heet Co..t a Task # 08A <br />rage Z of <br />EMPMENT HAUL DISTANCE and Time <br />Nea.est Maio, City or Town within project area region: <br />CKAIG <br />Total one-way travel distancc: <br />Z.66 Miles <br />Average T.a�cl Spec& <br />�.'uu mph <br />Total Non-Roadable tvtob/De...ob Lost T <br />`* two .ou..d t..},3 with haul .ig: <br />$781.31 <br />Total rundable Moo/JJcmut) Cost ** <br />** o..e.ou..a Lip, Lill ttaut Lig: <br />$2.39 <br />1 tansportation Cycle Time: <br />N u..- <br />1(oaHable <br />Roadable <br />Lquipment <br />Equipment <br />Haul 1 i...e (Hours): 0.06 <br />0.06 <br />xeturn Time (Hours): 0.06 <br />0.0_6 <br />Loading Time (Hours): 0.50 <br />NA <br />Unloading Time (Hours): 0.50 <br />NA T <br />Subtotals: 1.1 1 <br />u. i i <br />JuB TIME AND c:uST <br />1 otal job time: 2.23 Hou.3 <br />Total job cost: $784 <br />CIRI,ES Cost Bti—ating Sof wary <br />