Laserfiche WebLink
Bulldozer Worksheet Cont'd 1 ask # 05A rage z ut L <br />Spoil pile: <br />Puah g,adie„ t. <br />Altitude: <br />Material Weight: <br />tilaae type: <br />1.000 <br />1.000 <br />1.000 <br />Net correction: 0.8593 <br />Adjusted unit production: 1,1248) LCY tlr <br />Adjusted fleet vioauction: 1114.05 LCY lir <br />JOB TIME AND COST <br />Flea 3i�e: 1 IJ uq5) <br />Unit coat: $0.226iLCY <br />I utal Jul) time: 13.49 Hours <br />I otal jou cost: $3,399 <br />(PND -RF) <br />(CAT HB) <br />kCA I tits <br />(CAT HB) <br />(PAT) <br />