BULL1JULtK KIFFINU WOKK
<br />1 ask de5c, iption: Rip compated areas
<br />Site: McCoy r:t _ renult Action: 2015-08 Inspection
<br />PROJECT IDEN t it ICATIuN
<br />1 ask #: 03A State: Culmadu
<br />Date: 8/20/2015 COullty: Kuutt
<br />User: ACY
<br />Agel,cy or organization name: DRMS
<br />Banc Machine: Cat D8T - 8SU
<br />Kippr,, Attachment: 1 -Shank Ripper
<br />Seismic:
<br />Area:
<br />Cost Breakdown:
<br />Ownership Cu3t/ilou,:
<br />Ot,e,ating CuAffluu,:
<br />Rippe, O},e,at,,,g CV,)VHOuI:
<br />Upulatol uubt/Houl:
<br />Total U„it Co5t/Iluul:
<br />Alte, vale Metho'u5:
<br />Pe,,,,it/Jobff: Mly81U88
<br />Abbreviation: None
<br />Filename: M088 -03a
<br />He,aet,o We,: 310
<br />5nitt tsaai5: 1 per day
<br />Uata Source: (CRG)
<br />Utilization %
<br />u NA
<br />22 100
<br />4 100
<br />$ /u.0
<br />$108.
<br />feet
<br />$9.4
<br />(CAT HB)
<br />$38.01
<br />NA
<br />SLL�.57
<br />$225.67
<br />Selected e3tnuatn,g n,etnoa: Area
<br />NA tsank velu,,,e: NA
<br />20.00 ae,e3 Kit, Uet,th (tt): 1.00
<br />Source of estimated quantity: A1viz t,.hibit L
<br />HOURLY PRODUCTION
<br />Seial,lie:
<br />Seismic Velocity: NA
<br />Area:
<br />Avclage K,t.rtnng Uepttl:
<br />Avclagc Kipping width:
<br />Ave,age Kipping Length:
<br />Average Dozer Speed:
<br />Average Maneuver Time:
<br />Prod,.cuoi, ye, unit a,ea:
<br />Job Canaition Correction Factors
<br />Uuadjuated Ht7u,ly unit Yloaul:tloll:
<br />Site Altitu'ue:
<br />Altitude Aaj:
<br />Job t;tticiency:
<br />Net Correction:
<br />Adju3tca Hourly Unit nuductlon
<br />Aajuntca Howly deet Production
<br />JOB TIME A1v D C V ST
<br />Fleet sire: 1 Cil auel(5)
<br />U„itw3t: $44/.814 re, acre
<br />3.71
<br />5.56
<br />200.00
<br />88.00
<br />0.L:)
<br />0.60/
<br />BCY NA
<br />Volume: 64,533 b y o, C C Y
<br />feet/3eco„ 8
<br />mph
<br />deg,eea
<br />feet
<br />ICet
<br />Leet
<br />acres/hour
<br />0.607 Acres/hr
<br />/,800
<br />feet
<br />1.00
<br />(CAT HB)
<br />0.83
<br />(1 shift/day)
<br />0.83
<br />,,,ultit,lie,
<br />0.50
<br />Acres/hr
<br />0.50
<br />Ae, e3! hr
<br />Total job time:
<br />Jy.5y tiouln
<br />Total job cost:
<br />$S,!OA
<br />CIRLES lAat Estimuti,,g Software
<br />
|