Laserfiche WebLink
Mobilization Worksheet Cont'd Task FF USA <br />EOUIPMENT HAUL DIS iANCE and Time <br />Nearest Mclim City u. 1 vwu witnill 1.r,oject area region: <br />1 vital o„e-way travel distance: <br />Average Travel Speed: <br />I otal Non-Roadable Mob/Demob Cost * <br />.IF two round trips with haul rig: <br />Total Roadable Mob/Demob Ci,St ** <br />** one round trip, .so haul , ir,: <br />Haul Time (Ho.,3) <br />Ritu,u Ti,ue (Heu,i) <br />Load,,,g i ime (Huu,z,) <br />U„loaau,g t uiie (Hours) <br />Subtotals <br />JOB TIME AND COST <br />Riadable Koaaable <br />Egu, ,,,eut tclHipment <br />1.UU 1.00 <br />1.UU 1.00 <br />0.50 NA <br />0.50 NA <br />Page 2 of 2 <br />EAGLE <br />35.00 ,,,'1e5 <br />35.00 11,Yn <br />$1.19U.3S <br />$.)00.60 <br />3.00 2.00 <br />1 ictal job time: 6.00 Hours <br />Total job Cost: $1,241 <br />CIRCES Cost Estimating Software <br />