Laserfiche WebLink
Keveg worksheet Cont'd I ask # 05A Page 2 of 2 <br />MULCHING an?i MINg-ELLANEuUS <br />Materials <br />riciUitliuc - l.ulLail �w'+.v punk; <br />Straw, delivered {MEANS 31 25 14.16 1200} <br />Total Mulch Materials Cost/Acre <br />Application <br />Total Seed Application Cost/Acre $88.20 <br />Units / <br />Acre Unit Cost / Unit <br />1.00 ACRE $16.24 <br />2.00 _ TON $265.00 <br />l <br />Cost /Acre <br />$16.24 <br />$530.00 <br />$546.24 <br />Description <br />Cost /Acre <br />Crimping, with tractor {DMG survey data <br />$65.89 <br />Weed spray, truck, non -aquatic area, nox. [DMG] <br />$61.49 <br />Total Mulch Application Cost/Acre <br />1 $127.38 <br />NURSERY STOCK PLANTING <br />No / Type e and Size Planting Fertilizer <br />Common Name Acre Cost Pellet Cost Cost /Acre <br />$ <br />} _ _ Totals Nursery Stock Cost / Acre $0.00 <br />JOB TI1viE AND COST <br />NU. at AM es: 63.43 Coat Ac c: $L13S.Uj <br />rbti,,,ate3 rallure Rake: 5010 CO3t Aeic": $1 1.i6.03 <br />;�5elcetea replanting Work Items: FERTILIZING,TILLINli,5ttU1NG-MU <br />LCHING <br />I,.itial job Cost: <br />$7L,058.38 <br />Kc3cedl,,g jib Cuz t: <br />$36,029.19 <br />1—utal Juub Cost: <br />$108,088 <br />Job Hours: <br />60.00 <br />CIRCES Cubt EstimaLing Software <br />