My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-02_PERMIT FILE - M2015030 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015030
>
2015-10-02_PERMIT FILE - M2015030 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:15 PM
Creation date
10/5/2015 10:31:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015030
IBM Index Class Name
PERMIT FILE
Doc Date
10/2/2015
Doc Name
Placement of Markers
From
Asphalt Specialties
To
DRMS
Email Name
ECS
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L 11 <br />Page 77 <br />Construction Materials Rule 3 <br />iis(a)(r) 3.1.11 Buildings and Structures <br />If the affected land is owned by a legal entity other than any local, state, or <br />federal entity, any buildings or structures including those constructed or <br />placed on the affected lands in conjunction with the mining operations or <br />which are historic structures as determined by the State Historic <br />Preservation Office may, at the option of the Operator and Landowner and <br />with the approval of the Board, remain on the affected land after reclamation <br />if such buildings or structures will not conflict with the post -mining land use <br />and the structures conform to local building and zoning codes. <br />E.1.1:2:Sig::ns:andM <br />(1) At the entrance of the mine site the Operator shall post a sign, <br />which shall be clearly visible from the access road, with the <br />following: <br />(a) the name of the Operator; <br />(b) a statement that a reclamation permit for the operation has <br />been issued by the Colorado Mined Land Reclamation <br />Board; and <br />(c) the permit number. <br />(2) The boundaries of the affected area will be marked by monuments <br />or other markers that are clearly visible and adequate to delineate <br />such boundaries. <br />100 0 <br />, (a) for Limited Impact 110 Operations the permit boundary for <br />the purposes of this Rule shall be considered the affected <br />�r 0 V area; <br />Ix <br />(b) for Special 111 Special Operations and a ular 11 <br />Reclamation Operations the area proposed to be disturbed <br />by mining operations for which a Financial Warranty and <br />Performance Warranty have been posted shall be the <br />affect�,a. <br />
The URL can be used to link to this page
Your browser does not support the video tag.