Laserfiche WebLink
Yoast Mine C1994-082, 2013 Annual Reclamation Report Review <br />M <br />3. Please correct the conflicting values for the remaining topsoil stock pile material balance <br />as stated on page 4 of the report and the topsoil balance table, also shown on page 4 of <br />the report. <br />4. The acreage reported as Bond Released by SCC is not in agreement with the Division's <br />data base. The Division researched each of the five bond releases, and the bond increase <br />with the resulting values: <br />:.g. :.d. <br />Release release <br />acres <br />No. phase <br />released <br />date approved <br />SLI Phase <br />173.02 <br />3/6/2007 <br />SI -2 Phase 1 <br />456.7 <br />6/15/2010 <br />SL3 Phase 11 <br />592 <br />1/18/2012 <br />SI -4 Phase <br />115.5 <br />11/9/2012 <br />S11 Phase 1 <br />-32.7 <br />11/14/2012 acreage rescinded <br />SI -5 Phase <br />6.5 <br />3/5/2014 <br />Phase 11 <br />6.5 <br />Phase 111 <br />6.5 <br />total Phase 1 <br />719.02 <br />total Phase 11 <br />598.5 <br />total Phase 111 <br />6.5 <br />Please bring SCC's Annual Reclamation Report form into agreement with the correct <br />bond released values. <br />Please provide responses prior to SCC's submittal of the 2015 ARR. Please correct these items <br />for the 2014 ARR, and incorporate the appropriate corrections into the 2015 ARR as appropriate. <br />Sincerely, <br />Janet Binns <br />Environmental Protection Specialist III <br />555 Street Address, Room 555, Denver, CO 55555-5555 P 555.555.5555 <br />