Laserfiche WebLink
graded to the final reclamation slopes as mining operations are on-going where possible. It is the <br />owner's intent to have a slurry wall installed to mitigate infiltration of ground water as part of the final <br />reclamation plan, so re -vegetation of the slopes has not begun, but shall be completed once the wall is <br />installed. The timeline for installing the slurry wall is estimated to be 2016/2017, but could be sooner if <br />the market conditions allow. <br />