Laserfiche WebLink
• <br />• <br />RECLAIMED AREA -'C' FACTOR <br />Portal Area and Benches <br />No appreciable canopy. Canopy is assumed to be the cover contributed by trees and shrubs. Based on <br />the 2000 vegetation study the combined tree and shrub cover totals 2.6%. The percent ground cover for <br />the reclaimed area shown on the preceding page is 83.9%. Use figure 7 identified above and <br />interpolate to determine the C factor for 83.9% cover. <br />NO APPRECIABLE CANOPY <br />CANOPY <br />PERCENT GROUND COVER <br />80.0 83.9 <br />100.0 <br />0% <br />G 0.013 0.011 <br />0.003 <br />2.6% <br />Hecialmedac or 0.077 <br />25%/0 <br />0.003 <br />USING THE UNIVERSAL SOIL LOSS EQUATION <br />A=RKLSCP <br />A is the soil loss in Tons/Acre/Year <br />Baseline <br />Reclaimed Relcaimed <br />Reference <br />Portals Benches <br />R = rainfall factor <br />30.00 <br />30.00 30.000 <br />K = soil erodibility factor - Nihill channery loam <br />0.24 <br />0.24 0.240 <br />LS = combined length slope factor <br />Portal & Reference 300' Slope 29%% Grade <br />13.20 <br />13.20 <br />Benches 340' Slope 14%% Grade <br />4.200 <br />C = cropping management factor: <br />'C' - Crop Management - Baseline <br />Canopy 26.5% <br />Cover - Grass 22.5°/% <br />Ground Cover 83.1°/% <br />0.011 <br />'C' - Crop Management - Reclaimed <br />Canopy 2.6% <br />Cover - Grass 23.5% <br />Ground Cover 83.9°/% <br />0.011 0.011 <br />P = erosion control practice factor <br />1.00 <br />1.00 1.000 <br />Soil Loss <br />AREA R K LS <br />C <br />P A <br />Baseline 30 0.24 1 1 <br />Reference Area <br />Reclaimed 3 .011 1.0 1.01 <br />Portal <br />Reclaimed4.2 0.0111.0 0.32 <br />Benches <br />It can be seen from the above calculation that the portal area of the reclaimed mine site and the benches <br />may loose about 1.01 tons and 0.32 tons per acre per year to erosion respectively. The baseline <br />conditions may loose about 1.01 tons per acre per year to erosion. <br />The above calculation demonstrates that untreated drainage from the reclaimed area will contribute the <br />same amount or fewer suspended solids to streamflow or runoff outside the permit area as untreated <br />drainage from the natural surrounding premining area. <br />4-58iv <br />06/01 <br />