My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-30_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2015-09-30_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:06 PM
Creation date
10/1/2015 8:45:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
9/30/2015
Doc Name
Adequacy Review
From
DRMS
To
Seneca Coal Company, LLC
Type & Sequence
RN4
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
073 <br />Drill Seed Mix 1B on Haul Road and Deadhead <br />REVEGE <br />1 <br />40.00 <br />$18,152.00 <br />Job superintendent: <br />Corridor <br />Total = <br />Profit: <br />10.00 <br />Total = <br />074 <br />1 <br />$178,669.00 <br />Drill Seed Mix 1 - Reseed Phase II Areas-100% of <br />REVEGE <br />592.70 <br />592.7 Acre <br />080 <br />1 <br />$112,939.00 <br />Rill and Gully and Road Maintenance <br />SITEMAINT <br />220.00 <br />ENANCE <br />081 <br />1 <br />$57,636.00 <br />Clean Sediment Ponds 010, 011, 011A, 012, 012A <br />TRUCKI <br />145.87 <br />and 014 One T <br />085 <br />1 <br />$10,142.00 <br />Mobilize/Demobilize Equipment for Initial <br />MOBILIZE <br />3.33 <br />Reclamation <br />086 <br />1 <br />$2,652.00 <br />Mobilize/Demobilize Equipment for Pond <br />MOBILIZE <br />3.33 <br />Removal <br />087 <br />1 <br />$53,921.00 <br />Mobilize/Demobilize Equipment for Site <br />MOBILIZE <br />11.33 <br />Maintenance <br />100 <br />1 <br />$2,489.00 <br />Regrade Pond 013 Slide Scarp <br />DOZER <br />9.81 <br />101 <br />1 <br />$1,244.00 <br />Regrade Neck Pit Slide Scarp <br />DOZER <br />4.90 <br />SUBTOTALS: <br />2996.25 <br />$1,579,314 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />Performance bond: <br />1.05 <br />Total = <br />Job superintendent: <br />1,498.12 <br />Total = <br />Profit: <br />10.00 <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.25 <br />4.00 <br />CONTINGENCY: 0.00 <br />Total = <br />Total = <br />$31,902.14 <br />$16,582.80 <br />$112,598.70 <br />$157,931.40 <br />$319,015.04 <br />$1,898,329.04 <br />0.00 <br />$80,678.98 <br />$75,933.16 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $475,627.19 <br />TOTAL BOND AMOUNT (direct + indirect) = $2,054,941.19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.