Laserfiche WebLink
Task description: <br />Site: Yoast Mine <br />BULLDOZER WORK <br />ade Pond 012 <br />Permit Action: RN4 <br />PROJECT IDENTIFICATION <br />Task #: 032 State: <br />Date: 6/18/2015 County: <br />User: JHB <br />Colorado <br />Routt <br />Agency or organization name: DRMS <br />Permit/Job#: C1994082 <br />Abbreviation: None <br />Filename: C082-032 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi -Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$81.10 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$2.23 <br />25 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $264.49 <br />Total Fleet Cost/Hour: $264.49 <br />MATERIAL QUANTITIES <br />Initial Volume: 26,729 <br />Swell factor: 1.165 <br />Loose volume: 31,139 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Unadjusted hourly 910.5 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% <br />Average site altitude: 7,250 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />