My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-09-30_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2015-09-30_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:11:06 PM
Creation date
10/1/2015 8:45:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
9/30/2015
Doc Name
Adequacy Review
From
DRMS
To
Seneca Coal Company, LLC
Type & Sequence
RN4
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Yoast Mine <br />PROJECT IDENTIFICATION <br />MOTOR GRADER WORK <br />Diversion 14A <br />Permit Action: RN4 <br />Task #: 034 State: Colorado <br />Date: 9/11/2015 County: Routt <br />User: JHB <br />Agency or organization name: DRMS <br />Permit/Job#: C1994082 <br />Abbreviation: None <br />Filename: C82-034 <br />HOURLY EQUIPMENT COST <br />degrees <br />14.00 <br />Basic Machine: CAT 14M <br />2.00 <br />Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper <br />feet <br />Shift Basis: 1 per day <br />acres/hour <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$45.44 <br />NA <br />Operating Cost/flour: <br />$69.88 <br />100 <br />Ripper Operating Cost/flour: <br />$0.89 <br />25 <br />Operator Cost/flour: <br />$24.47 <br />NA <br />Total Unit Cost/flour: <br />$140.67 <br />Total Fleet Cost/Hour: <br />$143.34 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 1.10 <br />Source of estimated acreage: Division Estimate <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />1.25 <br />mph <br />Production Deration - 125 <br />0 <br />degrees <br />14.00 <br />feet <br />2.00 <br />feet <br />12.00 <br />feet <br />1.8182 <br />acres/hour <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $85.97 <br />1.6364 <br />1.6364 <br />Site Altitude: 7200 feet <br />acres/Hour <br />acres/Hour <br />Grader(s) Total job time: 0.67 <br />per acre Total job cost: $95 <br />acres <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.