Laserfiche WebLink
Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />1.516 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />Material Weight: <br />0.902 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.9579 <br />Adjusted unit production: 2,749.46 LCY/hr <br />Adjusted fleet production: 5498.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.189/LCY <br />Total job time: 7.80 Hours <br />Total job cost: $8,118 <br />