Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Reclaim 10 -East Mid -Panel Emergency Air Borehole <br />Site: Foidel Creek Mine Permit Action: MR289 Permit/Job#: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 000 <br />Date: 8/26/2015 <br />User: JLE <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C056-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />Plug and seal 10 -East Mid -Panel Emergency Air <br />Borehole <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />12.72 <br />$6,450.21 <br />$1,430.00 <br />$1,364.00 <br />$433.00 <br />Regrade Borehole Pad and Mud Pit <br />DOZER <br />6.64 <br />Replace Topsoil on Drill Pad <br />DOZER <br />6.33 <br />Revegetation of 10 -East Mid -Panel Borehole Pad <br />REVEGE <br />1.20 <br />SUBTOTALS: <br />26.89 <br />$9,677 <br />INDIRECT COSTS <br />$195.48 <br />OVERHEAD AND PROFIT: <br />$101.61 <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />13.45 hrs <br />Profit: <br />10.00% <br />Total = <br />$195.48 <br />Total = <br />$101.61 <br />Total = <br />$1,010.53 <br />Total = <br />$967.70 <br />TOTAL O & P = <br />$2,275.32 <br />CONTRACT AMOUNT (direct + O & P) = <br />$11,952.32 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />425% <br />Total = <br />$507.97 <br />Reclamation management and/or administration: <br />5.00% <br />$597.62 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$3,380.91 <br />TOTAL BOND <br />AMOUNT (direct + indirect) = <br />$13,057.91 <br />