Laserfiche WebLink
DATDATE DESCRIPTION <br />150 0 130 300 FT <br />DENT PROVIDED BY ISSUED FOR PROJECF <br />CRIPPLE CREEK & VICTOR GOLD MINING COMPANY TRI -76 <br />REFERENCE: r <br />ay ' '/ <br />A( <br />w ,'' <br />FORESIGHT WEST SUEYING, INC.: REN FROM RV <br />SQUAW GULCH BASE TOPO - PHASE 1 - REWSED.DWG <br />0 05 <br />RECV MARCH 14, 2010) <br />DRN BY TITLE <br />DISCLAIMER <br />RECV APRIL 24, 2010) <br />u',.,I <br />AMEC FOSTER WHEELER PRODUCED THE INFORMATION PRESENTED ON DSN BYTHISDRAWINGTHROUGHTHEUSEOFTECHNICALINFORMATIONAND <br />41ddr ,-- -e4'a1 <br />PRACTICAL EXPERIENCE SPECIFIC TO ITS EFFORTS. RECEIVING THIS amec RD <br />rp <br />py4MILLProREQUAGULCHVLF <br />DRAWING DOES NOT GUARANTEE ANY RIGHTS TO SUCH TECHNICAL <br />VLF2 TOPO EXPANSION B-OS-II.DWG <br />INFORMATION AND PRACTICAL EXPERIENCE. ANY ALTERATION OR foster BRBADAPTATIONOFTHEDATAORCONTENTSOFTHISDRAWINGSHALLBE <br />APR BYATUSERSSOLERISKANDWITHOUTANYLIABILITYORLEGAL <br />SQUAW GULCH VALLEY LEACH FACILITY <br />RESPONSIBILITY TO AMEC FOSTER WHEELER. wheeler ALM <br />PROJECT No. <br />BARREN PIPELINE CONNECTION 74201125G <br />SITEPLAN <br />DRAWING No. REV <br />D100 0 <br />DESCRIPTION <br />150 0 130 300 FT <br />DENT PROVIDED BY ISSUED FOR PROJECF <br />CRIPPLE CREEK & VICTOR GOLD MINING COMPANY TRI -76 <br />REFERENCE: r <br />ay ' '/ <br />A( <br />w ,'' <br />FORESIGHT WEST SUEYING, INC.: REN FROM RV <br />SQUAW GULCH BASE TOPO - PHASE 1 - REWSED.DWG <br />RECV MARCH 14, 2010) <br />DRN BY TITLE <br />DISCLAIMER <br />RECV APRIL 24, 2010) <br />MGC <br />SQUAW GULCH BASE TOPO - PHASE 3.DWG <br />AMEC FOSTER WHEELER PRODUCED THE INFORMATION PRESENTED ON DSN BYTHISDRAWINGTHROUGHTHEUSEOFTECHNICALINFORMATIONAND <br />RECV JANUARY 13, 2011) <br />PRACTICAL EXPERIENCE SPECIFIC TO ITS EFFORTS. RECEIVING THIS amec RD <br />CHK BYDRAWINGDOESNOTGUARANTEEANYRIGHTSTOSUCHTECHNICAL <br />VLF2 TOPO EXPANSION B-OS-II.DWG <br />INFORMATION AND PRACTICAL EXPERIENCE. ANY ALTERATION OR foster BRBADAPTATIONOFTHEDATAORCONTENTSOFTHISDRAWINGSHALLBE <br />APR BYATUSERSSOLERISKANDWITHOUTANYLIABILITYORLEGAL <br />SQUAW GULCH VALLEY LEACH FACILITY <br />RESPONSIBILITY TO AMEC FOSTER WHEELER. wheeler ALM <br />PROJECT No. <br />LEGEND: <br />i' EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PERIMETER ACCESS <br />PIPING• <br />FUTURE 30' SQUAW GULCH VALLEY LEACH FACILITY BARREN PIPELINE <br />AREQUA GULCH VALLEY LEACH FACILITY BARREN PIPELINE <br />SURVEYED k APPROXIMATE) <br />BARREN PIPELINE CONNECTION <br />RECEIVED <br />SEP 2 50 2015 <br />ot0O- <br />REFERENCE: r <br />ay ' '/ <br />A( <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />FORESIGHT WEST SUEYING, INC.: REN FROM RV <br />SQUAW GULCH BASE TOPO - PHASE 1 - REWSED.DWG <br />RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TOPO - PHASE 2.DWG <br />RECV APRIL 24, 2010) <br />SQUAW GULCH BASE TOPO - PHASE 3.DWG <br />RECV MAY 4, 2010) <br />CCV TOPO EXPANSION 12-29-10 NORTH AREADWG <br />RECV JANUARY 13, 2011) <br />CCV TOPO EXPANSION 01-28-11 SOUTH AREA.DWG <br />RECV JANUARY 28, 2011) <br />SH67 TOPO 7-07-11.DWG <br />RECV JULY 11, 2011) <br />VLF2 TOPO EXPANSION B-OS-II.DWG <br />RECV AUGUST 9, 2011) <br />09028-COMOSITE-TOPO MLE OMRS.DWG <br />RECV MAY 28, 2010 FROM CC&V) <br />ISSUED DATE <br />SQUAW GULCH VALLEY LEACH FACILITY 8/3/15 <br />PROJECT No. <br />BARREN PIPELINE CONNECTION 74201125G <br />SITEPLAN <br />DRAWING No. REV <br />D100 0