Laserfiche WebLink
Austin Malotte, P.E. <br />September 17, 2015 <br />Page 6 <br />any water court case or any other legal action that may be initiated concerning the <br />SWSP. This decision shall not bind the state engineer to act in a similar manner in any <br />other applications involving other plans or in any proposed renewal of this plan, and <br />shall not imply concurrence with any findings of fact or conclusions of law contained <br />herein, or with the engineering methodologies used by the Applicant. <br />Should there be any further comments or questions, please contact Dean Santistevan, <br />Assistant Division Engineer in Greeley at 970-352-8712 or loana Comaniciu of this office. <br />Sincerely, <br />2�2 <br />�A� ;v' <br />ff De therage, P.E. <br />Chi f Water Supply <br />Attachments: Figure 1, Tables 1 Ft 2 <br />Aurora Lease <br />Administration Protocol "Augmentation Plan Accounting, Division One - South <br />Platte River" <br />cc: Dean Santistevan, Assistant Division Engineer, Dean.Santistevan@state.co.us <br />810 91h Street, 2nd Floor, Greeley, Colorado 80631, 970-352-8712 <br />William Schneider, District 2 Water Commissioner, William. Schneider@state.co.us <br />810 9th Street, 2 d Floor, Greeley, Colorado 80631, 970-352-8712 <br />Colorado Division of Reclamation Mining and Safety <br />JD/JMW/idc <br />