Laserfiche WebLink
Page 4 of 5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />approved mix: <br />whopsoil <br />replaced: <br />' <br />mulched w/ <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />apvd fertilizer: <br />//�� <br />V <br />replacement <br />depth (in.): <br />' n <br />G <br />rate (tons/ac): <br />Seed <br />application <br />{ N D <br />P <br />Fertilizer <br />application <br />Sao <br />�method: <br />Mulch <br />application <br />method: <br />�Cp <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO (N/A) <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the repo ap. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? YES NO N/A <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)?YES NO N/A <br />If "NO" please explain: <br />16. If mining has exposed groundwater, is the site in compliance with the approved mining pl ffice of the State <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/A <br />17. Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO N/A <br />19. Is your basis for legal right to enter still valid? YES NO <br />20. Does your permit require you to submit monitoring information annually? YES NO N/A <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: -Z <br />