Laserfiche WebLink
HAYWARD Schwartzwalder <br />BAKER Water Testing Report <br />Geotechnical Construction <br />Job Number: 600443 <br />Job Location: Golden, CO <br />Hole Number: F1 Top Depth (ft): 0.0 Top EI (ft): 0.0 <br />Stage Number: 1 Bot Depth (ft): 10.0 Bot EI (ft): -10.0 <br />Test Number: 1 Water EI (ft): 0.0 <br />Closure LUgeon: 19519.4.1 Total vol. (galp 8/.4 <br />20 <br />15 <br />a <br />a 10 <br />5 <br />L <br />a <br />0 <br />Date: <br />6/8/2015 <br />Start Time: <br />11:30 AM <br />End Time: <br />11:44 AM <br />Duration: <br />00:05:04 <br />Pay Time: <br />6 min <br />Gauge Pressure Effective Presse <br />0.0 <br />1.0 2.0 3.0 4.0 5.0 6.0 <br />Time (min) <br />25.0 <br />--�-- <br />20.0 <br />15.0 <br />- <br />i -- -- - , - - <br />-: --- - <br />- - <br />a <br />-°-° 10.0�- <br />o <br />LL 5.0 <br />j <br />-- <br />0.0 <br />------- <br />-_ -- fi - - . . -- - +- <br />- - <br />- _ <br />-- - - <br />-- - <br />0.0 <br />1.0 2.0 3.0 4.0 5.0 6.0 <br />Time (min) <br />30000.0 - <br />- --- <br />- --------- <br />25000.0 <br />-- <br />200.0 <br />ao <br />1&00.0 <br />- - -+- <br />- <br />1000.0 -- <br />---- __ - { _ <br />---- <br />5000.0 --- <br />0.0 <br />1.0 2.0 3.0 4.0 5.0 6.0 <br />Time (min) <br />Comments <br />Time ITech lComments <br />No comments submitted for this Water Testing operation. <br />