Laserfiche WebLink
HAYWARD Schwartzwalder <br />BAKER Water Testing Report <br />Geotechnical Construction <br />Job Number: <br />600443 <br />Start Time: <br />Job Location: <br />Golden, CO <br />I <br />Hole Number: <br />F14 <br />Top Depth (ft): 30.0 Top EI (ft): -30.0 <br />Stage Number: <br />3 <br />Bot Depth (ft): 40.0 Bot EI (ft): -40.0 <br />Test Number: <br />1 <br />Water EI (ft): 0.0 <br />Closure Lugeon: 14U39.92 <br />14.0 <br />12.0 <br />100 <br />8.0 <br />CL <br />R 6.0 <br />0 4.0 <br />U. 2.0 <br />0.0 <br />Date: <br />15 <br />Start Time: <br />a <br />10 <br />I <br />Duration: <br />00:05:01 <br />Pay Time: <br />a <br />5 <br />- - <br />a <br />0.0 <br />14.0 <br />12.0 <br />100 <br />8.0 <br />CL <br />R 6.0 <br />0 4.0 <br />U. 2.0 <br />0.0 <br />Date: <br />6/16/2015 <br />Start Time: <br />12:49 PM <br />End Time: <br />12:54 PM <br />Duration: <br />00:05:01 <br />Pay Time: <br />6 min <br />i otal vol. (gal): S2..i <br />Gauge Pressure Effective Pressure <br />1.0 2.0 3.0 4.0 <br />Time (min) <br />5.0 6.0 1 <br />0.0 1.0 <br />16000.0 <br />14000.0 <br />1200.0 <br />100.0 <br />Sb00.0 <br />*00.0 <br />W00.0 <br />2000.0 <br />0.0 <br />2.0 3.0 4.0 <br />Time (min) <br />5.0 6.0 I <br />0.0 1.0 2.0 3.0 4.0 5.0 6.0 <br />Time (min) <br />Comments <br />Time ITech lComments <br />No comments submitted for this Water Testing operation. <br />- -; <br />0.0 1.0 <br />16000.0 <br />14000.0 <br />1200.0 <br />100.0 <br />Sb00.0 <br />*00.0 <br />W00.0 <br />2000.0 <br />0.0 <br />2.0 3.0 4.0 <br />Time (min) <br />5.0 6.0 I <br />0.0 1.0 2.0 3.0 4.0 5.0 6.0 <br />Time (min) <br />Comments <br />Time ITech lComments <br />No comments submitted for this Water Testing operation. <br />